Reorder: Phase 1c before 1b (refactor first, then review/lint + full re-verify)
1c (full git reproducibility: cc-ci-secrets split, cert-in-sops, genuine D8 live rebuild) now runs before 1b. This way 1b's review/lint and its final cold re-verification of all D1-D10 cover the final refactored state (incl. the secrets split) and the genuine post-1c D8 — rather than reviewing pre-refactor code and re-verifying a flawed D8. Updated status lines in 1b/1c and the README ordering. Sequence: 1 -> 1c -> 1b -> 2 -> 2b -> 3. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -1,7 +1,8 @@
|
||||
# cc-ci Phase 1c — Full git reproducibility + genuine D8 live rebuild (Autonomous Build Plan)
|
||||
|
||||
**Status:** QUEUED — runs after Phase 1 (`plan.md`); pairs with Phase 1b (review/lint). **Manual**
|
||||
transition. **Driven by the Builder + Adversary loops** (same protocol as `plan.md` §6/§6.1/§7) —
|
||||
**Status:** QUEUED — runs after Phase 1 (`plan.md`) and **before Phase 1b** (review/lint), so the
|
||||
review/lint pass covers this refactor and its final cold re-verification proves the genuine
|
||||
(post-1c) D8. **Manual** transition. **Driven by the Builder + Adversary loops** (same protocol as `plan.md` §6/§6.1/§7) —
|
||||
the orchestrator does NOT do this; the loops do, and the Adversary independently re-proves it cold.
|
||||
**This file's path:** `/srv/cc-ci/cc-ci-plan/plan-phase1c-full-reproducibility.md`
|
||||
|
||||
|
||||
Reference in New Issue
Block a user