Commit Graph
4 Commits
Author SHA1 Message Date
notplantsandClaude Opus 4.8 a8b4b4c39e upgrade-all: pin weekly slot (Sat 03:00 UTC) + defer activation until cc-ci is built
Operator: don't run the weekly upgrade-all while the build loops are still
constructing cc-ci (shared-host contention). Activate the Sat 03:00 UTC
(0 3 * * 6) cron only once the build is complete; on-demand until then.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-05-29 17:24:40 +01:00
notplantsandClaude Opus 4.8 db31c08d6a Add /recipe-upgrade + /upgrade-all skills (cc-ci-gated upgrades, never merge)
Per-recipe and fleet-wide upgrade skills modelled on recipe-maintainer's
recipe-upgrade-full / recipe-upgrade-cron-all, but gated by the cc-ci CI server
and inheriting ci-test-review's create+verify+never-merge discipline.

- recipe-upgrade/: plan (release notes, breaking changes) -> implement (abra
  recipe upgrade + version bump + config, lint) -> open the recipe PR -> VERIFY
  green on cc-ci (full suite cold against the PR head via verify-pr.sh). If the
  upgrade is correct but a cc-ci TEST went stale, also update the test, verify
  it, and open a second PR to recipe-maintainers/cc-ci. Never merges; never
  weakens a test; prefers a recipe-only PR. Emits a parseable RESULT line.
  + open-recipe-pr.sh: adapted recipe-create-pr; runs on cc-ci (has the recipe
    checkout + bot token), creds passed from the orchestrator .testenv;
    force-syncs the mirror main so the PR diff is exactly the upgrade.
- upgrade-all/: weekly fan-out — enumerate enrolled recipes, survey upgrades,
  run /recipe-upgrade per upgradeable recipe via subagent (sequential default,
  --parallel / --dry-run), collect into one PR-list summary. Coordination +
  single-writer + shared-Swarm-teardown guardrails; built for a weekly cron.
- ci-test-review/verify-pr.sh: pass SRC (recipe-maintainers/<recipe>) alongside
  REF so the harness clones the mirror PR head correctly (its real contract).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-05-29 17:19:20 +01:00
notplantsandClaude Opus 4.8 cbe1406bce ci-test-review: close the loop — author + open + cc-ci-verify fix PRs (never merge)
Per operator: the skill should not just propose, it should CREATE the fix PR
(recipe repo or cc-ci repo) and VERIFY it green on its own CI server — but not
merge. It drives cc-ci like the loops do.

- SKILL.md: diagnose+classify (recipe vs CI-server) -> author the fix + open a
  PR (recipe-create-pr for recipe PRs; Gitea API for cc-ci PRs, dedicated branch
  in a separate clone, single-writer safe) -> VERIFY on cc-ci (full suite cold
  against the PR head = the !testme dogfood path) -> report a verified,
  ready-to-merge PR. Never merges; never weakens a test; flake != bug. General
  bar = one cold green; repeated-green (REPEAT=3) only for a known-flaky recipe.
  Adds coordination/single-writer guardrails (shared Swarm is stateful; tear
  down deploys; never push main or touch the loops' clones).
- verify-pr.sh: deterministic recipe-PR gate — RECIPE + REF -> cold full suite
  on cc-ci, green iff every repeat exits 0. CI-server-PR verification stays
  bespoke (branch checkout + rebuild + regression sample) per SKILL.md.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-05-29 17:04:35 +01:00
notplantsandClaude Opus 4.8 2530845e50 orchestrator: add /ci-test-review skill (in THIS repo) + drop Phase 3r from loops queue
The on-demand AI review layer is now an orchestration-repo skill built directly
by the orchestrator, NOT a loops phase in the cc-ci product repo:

- .claude/skills/ci-test-review/{SKILL.md,run-all-recipes.sh}: runs the real
  cc-ci harness across all enrolled recipes (deterministic, AI-free execution),
  then AI diagnoses each failure and classifies it as needing a recipe PR / a
  CI-server PR / a stale-test update — or reports "ALL PASSED, recipes + tests
  up to date". Proposes PRs; never decides pass/fail; never auto-merges.
- .gitignore: track .claude/skills/ (shareable) while still ignoring local
  claude session state (locks, history) under .claude/.
- launch.sh: remove Phase 3r from PHASES_SPEC; loops sequence back to
  1c 1b 1d 1e 2w 2pc 2 2b 3 4. Deleted plan-phase3r (superseded by the skill).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-05-29 16:57:26 +01:00