Author SHA1 Message Date
01874821f2 decommission Pi: update all docs for VM-only setup
The orchestrator Pi is retired (2026-05-31). All agents now run on the
cc-ci-orchestrator VM (NixOS, loops user, /srv/cc-ci). The VM is a
direct tailnet peer to cc-ci — no SOCKS proxy, no userspace tailscaled,
no ProxyCommand. Updated across all affected files:

AGENTS.md
  - Remove Pi from reboot description; migration complete (not "parked")
  - cc-ci access: direct ssh, not via proxy

kickoff.md
  - Prerequisites: direct tailnet peer, not proxy
  - Host deps: NixOS (not apt)
  - Fallback/Incus: b1 reachable directly, no --proxy curl flag

plan.md §1 + §1.5
  - §1 bootstrap: direct SSH, check tailscale status (not restart proxy)
  - §1.5 intro: "VM" not "sandbox host"; no proxy
  - Credentials table: remove TS_AUTH_KEY row; update cc-ci SSH row
  - Replace "Tailscale connection (proxy)" subsection with direct-peer description

plan-orchestrator-migration.md
  - Mark COMPLETE (2026-05-31); historical record only

plan-phase1c-full-reproducibility.md
  - Incus access: direct, not via SOCKS proxy

prompts/builder.md + prompts/adversary.md
  - cc-ci access language only: direct ssh, no proxy restart instructions
  - adversary: *.ci.commoninternet.net via plain curl, no proxy flag

REBOOTS.md
  - Retitle for VM; note Pi retired; Pi entries marked historical

systemd/cc-ci-loops.service
  - User/Group/HOME/PATH: notplants → loops
  - Remove cc-ci-tailscaled.service dependency (no proxy on VM)
  - Add note about nix/configuration.nix as the authoritative VM declaration

test-e2e-testme-acceptance.md
  - tailscale status: no --socket flag
  - ssh to throwaway: no ProxyCommand

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-05-31 00:16:37 +00:00
782a3c7360 Phase-1c: true verification = Adversary deletes the throwaway VM, creates a fresh one, full install
Strengthen C4/W5: the genuine reproducibility proof is a clean-room repeat — the Adversary
destroys any existing throwaway VM, creates a brand-new blank VM, and runs the entire install
from scratch per docs/install.md so nothing from the Builder's setup attempt can mask a gap.
Cold, with logged evidence (VM id, exact install commands, convergence + TLS-from-git-cert).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-27 16:05:54 +01:00
9d13bb0b58 Reorder: Phase 1c before 1b (refactor first, then review/lint + full re-verify)
1c (full git reproducibility: cc-ci-secrets split, cert-in-sops, genuine D8 live rebuild)
now runs before 1b. This way 1b's review/lint and its final cold re-verification of all
D1-D10 cover the final refactored state (incl. the secrets split) and the genuine post-1c
D8 — rather than reviewing pre-refactor code and re-verifying a flawed D8. Updated status
lines in 1b/1c and the README ordering. Sequence: 1 -> 1c -> 1b -> 2 -> 2b -> 3.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-27 15:51:07 +01:00
c6d27b251a Phase-1c: split only secrets into a separate cc-ci-secrets repo; base stays parameterized
Per operator: the split boundary is secrecy, not modularity. Only the sops-encrypted secrets
(incl. the wildcard cert) move to a separate private repo `cc-ci-secrets` (extra access-control
layer), consumed by the base via a flake input. Instance non-secret vars (domain, gateway,
recipients) stay in the well-parameterized base cc-ci repo — another admin repoints by editing
params, no second config repo. Guardrail reworded: instance vars in base are fine; only plaintext
SECRETS must never leak into base/store. Updated model/C1/C2/W2/§6/§7 + README.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-27 15:47:57 +01:00
769dfd0c62 Phase-1c: resource plan -> 4GB/4GB under a 12GB guideline (not 2GB)
Per operator: don't downsize cc-nix-test to 2GB. Instead raise the terraform-ci running-RAM
guideline to ~12GB (it's doc-only — the project has no enforced limits.memory; b1 is 16GB),
resize cc-nix-test 6->4GB, and create the throwaway VM at 4GB (4+4+lichen 4 = 12 <= 16).
Updated W1/W3/C6/§4 and the incus memory note.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-27 15:29:37 +01:00
d41a76f757 Add Phase-1c plan: full git reproducibility (secrets+cert in sops) + genuine D8 live rebuild
D8's throwaway-VM live rebuild was wrongly marked "infeasible by design" — the master
recovery age key defeats the sops-host-key reason, DNS/cert is a precondition not a
rebuild blocker, and Incus was available. Phase 1c (loop-driven): (A) make the VM fully
reproducible from git including ALL secrets — move the wildcard cert + every secret into
sops-in-git, split generic base repo from a private instance repo composed via a flake
input (the only out-of-band secret is the bootstrap age key); (B) actually perform +
cold-verify a blank-VM nixos-rebuild and rewrite D8 honestly. Resize cc-nix-test to 2GB
first to free b1 headroom for a sized throwaway VM; destroy it after; restore/promote
sizing. Gandi token stays out of repo/agent (only the cert artifact is committed). Linked README.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>