25 open recipe PRs had accumulated, and the list had stopped being readable: CI sweep artifacts that were never meant to merge sat next to genuine CVE fixes, and three PRs the operator had been told were outstanding were in fact already merged upstream (discourse #6 with 140 CVEs, keycloak #6 with 12, n8n #5) — visible only once the mirrors were reconciled. The skill: reconcile every mirror from true upstream FIRST (that step alone closed those three), survey every open PR deterministically, close the ones that cannot merge or were never meant to, and report prioritised action items — CVE-carrying first — for the ones that should land. It never merges a recipe PR. pr-survey.py gathers the facts and decides nothing: behind_main, mergeable, diff_files, which images the PR adds vs which are already pinned in main, the newest !testme verdict, branch kind, age. One correctness detail worth the extra state: a FAILED diff fetch is reported as unknown, never as an empty diff. gitea #4 reads that way (force-pushed branch) while being a verified green fix, and 'empty diff' is a close signal — so the tool says DIFF-UNREADABLE(do not close on this) instead.
cc-ci-plan
Self-contained handoff package for building the cc-ci Co-op Cloud recipe CI server with two autonomous Claude loops (a Builder and an adversarial Reviewer) running over days.
Start here
- Read
plan.md— the full plan and single source of truth (mission, Definition of Done, architecture, milestones, the two-agent coordination protocol, loop discipline). - Read
kickoff.md— how to launch and supervise the loops. - Run
./launch.sh startto bring up both loops + the watchdog.
Files
| File | Purpose |
|---|---|
plan.md |
The Phase-1 plan (build the CI server). Agents treat it as their single source of truth. |
plan-phase1c-full-reproducibility.md |
Phase 1c (runs first): make the VM fully reproducible from git (all secrets incl. the wildcard cert in sops, in a separate private cc-ci-secrets repo as a flake input; base stays well-parameterized) and do the genuine throwaway-VM live rebuild to close D8 honestly (the "infeasible by design" was overstated). |
plan-phase1b-review-lint.md |
Phase 1b (after 1c): deterministic linting/formatting in CI + a white-box review checklist (real tests, DRY harness, idempotent Nix, no footguns/secrets), ending in a full cold re-verification of all D1–D10 — now covering 1c's refactor. |
plan-phase1d-generic-test-suite.md |
Phase 1d (after 1b, before 2): a generic install/upgrade/backup/restore suite that runs on any recipe with zero config, with a recipe's own test_<op>.py overriding or extending the generic (Builder's call) and reusing the generic's deployment — no redeploy, plus optional custom install-steps; recipes needing special setup fail the generic form gracefully. The test-architecture foundation Phase 2 builds on. |
plan-phase1e-harness-corrections.md |
Phase 1e (after 1d, before 2): three operator-review corrections to the shared generic harness — (HC1) upgrade goes previous-release → PR head via deploy --chaos; (HC2) repo-local PR code runs only for approved recipes (default = cc-ci overlays + generic only); (HC3) the generic runs by default alongside an overlay, skipped only via explicit opt-out. |
plan-phase2-recipe-tests.md |
Phase 2 (after Phase 1e): build on the corrected generic suite — author the recipe overlays (port recipe-maintainer tests as test_*.py) + define custom install steps where a recipe fails generically. |
plan-phase2b-test-performance.md |
Phase 2b (after Phase 2, before Phase 3): empirically measure where test time goes and reduce it (image cache, readiness tuning, dedup deploys, warm infra, concurrency) — no weakened tests. |
plan-phase3-results-ux.md |
Phase 3 (after Phase 2b): beautiful YunoHost-style results — per-run level, image-forward PR comment (badge + summary card + app screenshot), polished dashboard. |
IDEAS.md |
Deferred/future ideas, parked out of current scope. |
brief.md |
The original one-page brief (context only; plan.md supersedes it). |
kickoff.md |
Launch & supervision guide. |
launch.sh |
Starts both loops + a watchdog; restarts dead loops; stops on ## DONE. |
prompts/builder.md |
Builder loop prompt (fed to claude by the script). |
prompts/adversary.md |
Adversary loop prompt. |
Before launching
- Set the org in
plan.md(git.autonomic.zone/recipe-maintainers/cc-ci) and lock the six proof recipes (§8). - Ensure the launching shell has: SSH+sudo to
cc-ci, the Gitea token,git.autonomic.zoneaccess. - Preconfigure test-app DNS + TLS (plan §4.0): point a wildcard
*.ci.commoninternet.netrecord at a gateway that TLS-passthroughs to cc-ci, and pre-issue the wildcard cert (*.ci.commoninternet.net+ci.commoninternet.net, via Gandi DNS-01) into/var/lib/ci-certs/live/on cc-ci. The agent handles everything else on cc-ci (Traefik file provider → that cert, swarm, routing) and does no ACME; renewal (~90 days) is an out-of-band operator task, so the DNS token never goes to the agent. export CC_CI_REPO=https://git.autonomic.zone/recipe-maintainers/cc-ci.gitso the watchdog can detect## DONE.
What "done" means
The loops stop only when all of plan.md §2 (D1–D10) hold and the Adversary has independently
re-verified each within 24h. The watchdog then tears the loops down automatically.