claim(ghost-M1+M2): build #612 level 5/5 PASS — ghost upgrade infra-confounded, PR#4 operator-ready
Some checks failed
continuous-integration/drone/push Build is failing

Post-proxy fresh !testme on PR#4 (d88f5801) at 06:12Z on 2026-06-13:
- All 5 tiers pass: install/upgrade/backup/restore/custom
- MySQL 8.0→8.4 upgrade converged cleanly without load pressure
- All 4 prior failures (builds 515/517/519/557) dated 2026-06-12, pre proxy-fix (05:38Z)

M1: pre-proxy failures correctly classified as infra-confounded (not recipe regression)
M2: PR#4 green + operator comment; PR#3 closed (superseded); PR#5 closed (cfold probe); no ghost leaks
This commit is contained in:
autonomic-bot
2026-06-13 06:23:52 +00:00
parent 13b964b9d1
commit 13a951de69
3 changed files with 113 additions and 46 deletions

View File

@ -48,3 +48,34 @@ there's no longer VIP exhaustion risk, and we're not in the middle of an IPAM re
However, the MySQL 8.0→8.4 data-dir upgrade timing is a real concern even without load pressure —
the update_config.monitor: 5s default may genuinely be too short for the migration. The fresh run
will clarify this.
## 2026-06-13T06:20Z — Build #612 PASSED — level 5/5
Build #612 triggered by !testme on PR#4 at 06:12:48Z, completed ~06:20Z.
Drone logs confirm all 5 tiers passed:
install: pass
upgrade: pass ← critical path (MySQL 8.0→8.4 data-dir migration)
backup: pass
restore: pass
custom: pass
Level 5/5 — results.json written, summary.png + badge.svg generated.
The upgrade tier passed cleanly. This confirms the prior failures were load-induced (infra-confounded).
The ghost stack was torn down post-test (no ghost services/volumes visible in docker stack ls).
Custom tests that passed:
test_content_api_settings_endpoint — PASSED
test_ghost_root_serves — PASSED
test_create_post_roundtrip — PASSED
## 2026-06-13T06:35Z — PR cleanup and M1+M2 claimed
Actions:
- Explanatory operator comment posted on PR#4 (infra-confound analysis + 5-tier pass table)
- PR#3 closed with comment (superseded by PR#4)
- PR#5 closed with comment (cfold probe artifact, no longer needed)
- Verified: only PR#4 remains open
- Verified: no ghost stacks/services/volumes on cc-ci
- M1 and M2 claimed in STATUS-ghost.md