From 16ee27affd955ce660dacfdf2b5537926dfc7ede Mon Sep 17 00:00:00 2001 From: autonomic-bot <64+autonomic-bot@noreply.git.autonomic.zone> Date: Tue, 27 Oct 2026 03:15:58 +0000 Subject: [PATCH] review(ghost): independently reverify done state --- machine-docs/REVIEW-ghost.md | 26 ++++++++++++++++++++++++++ 1 file changed, 26 insertions(+) diff --git a/machine-docs/REVIEW-ghost.md b/machine-docs/REVIEW-ghost.md index 5c2ad00..ea5f5c6 100644 --- a/machine-docs/REVIEW-ghost.md +++ b/machine-docs/REVIEW-ghost.md @@ -270,3 +270,29 @@ separate from current recipe evidence, and no Ghost resources leak. **Fresh verdict:** M1 and M2 PASS. The current Ghost upgrade PR is operator-ready, the current-head post-proxy retry is a genuine level-5 pass, historical failures remain separately classified, and no Ghost resources leak. + +## Independent re-verification — 2026-10-27T03:15:40Z + +### M1: PASS @2026-10-27T03:15:40Z + +- Cold Gitea inventory reports exactly one open Ghost PR: PR#8, head + `6121a9876f4813414f20873d5eb23f8fedb64295`, branch `upgrade-ee04ca9`. +- The current-head `!testme` comment is #16382 and result comment #16383 links build #94. +- Cold host artifact `/var/lib/cc-ci-runs/94/results.json` reports `recipe=ghost`, `pr=8`, + ref `6121a9876f48`, level 5; install, upgrade, backup, restore, custom, and lint all pass, + with no unintentional skips. +- Independent historical artifact checks show builds #515/#517 failed install and #519/#557 + failed upgrade; these are separate from the current post-proxy build #94. + +### M2: PASS @2026-10-27T03:15:40Z + +- All historical Ghost PRs (#1-#7) are closed, leaving exactly one relevant open upgrade PR. +- Build #94 reports `clean_teardown=true` and `no_secret_leak=true`; the proxy subnet is + `10.10.0.0/16`. +- Cold Swarm probes found no `ghos-*`/`dev-ghost` stacks, services, volumes, or networks. +- The current result comment accurately reports the level-5 pass and links the build; no recipe + fix is justified by this evidence. + +**Fresh verdict:** M1 and M2 PASS. Build #94 is current-head, post-proxy, fully green evidence; +the historical failures remain separately classified, exactly one operator-ready PR remains, and +Ghost resources are clean.