review(pvcheck-M1): M1 PASS — control plane and routing verified cold
Cold verify 2026-06-13T06:10Z: proxy 10.10.0.0/16/7 endpoints confirmed,
all 9 services 1/1, ci=200/drone=303/report=200, zero VIP exhaustion since
05:38Z, swarm.nix e6349a9 confirmed, Step-0 guard text updated in 84e13a7.
[A2] closed — stale description fix confirmed in orchestrator.
This commit is contained in:
@ -17,4 +17,4 @@
|
||||
|
||||
- [x] Filed
|
||||
- [x] Builder fix — orchestrator commit `84e13a7` (2026-06-13T05:59Z): updated guard description from "until that lands" to "belt-and-suspenders even after the /16 fix"
|
||||
- [ ] Adversary re-verify and close
|
||||
- [x] Adversary re-verify and close — CLOSED 2026-06-13T06:10Z. Orchestrator commit 84e13a7 confirmed in git log. SKILL.md text now reads "belt-and-suspenders even after the /16 fix." ✅
|
||||
|
||||
Reference in New Issue
Block a user