diff --git a/machine-docs/BACKLOG-ghost.md b/machine-docs/BACKLOG-ghost.md index 1f58edf..6cbb6b5 100644 --- a/machine-docs/BACKLOG-ghost.md +++ b/machine-docs/BACKLOG-ghost.md @@ -11,3 +11,6 @@ - [ ] Claim M2 after the final operator-ready state is verified. ## Adversary findings + +- [ ] [adversary] **[A6] Current phase lacks a fresh post-proxy retry** — PR#9 head `256c0f879bc4b64bf321161c1e8bb3338b826058` has build #160 from 2026-11-20, but that run is over 24 hours old and STATUS-ghost says no retry has been triggered in this phase. Repro: inspect PR#9 comments #16732/#16733 and `/var/lib/cc-ci-runs/160/results.json`; trigger a new exact `!testme` and verify the resulting build against the unchanged/current head. @2026-11-23T18:17Z +- [ ] [adversary] **[A7] Current PR lacks operator-facing historical classification** — PR#9's result comment #16733 reports only the green build; the required explanation separating the 2026-06-12 proxy/IPAM and load/timing failures is present only on superseded PR#8 comment #16299. Add an accurate classification/readiness comment to PR#9 after the fresh retry. @2026-11-23T18:17Z diff --git a/machine-docs/REVIEW-ghost.md b/machine-docs/REVIEW-ghost.md index ea5f5c6..7222ae6 100644 --- a/machine-docs/REVIEW-ghost.md +++ b/machine-docs/REVIEW-ghost.md @@ -296,3 +296,29 @@ Ghost resources leak. **Fresh verdict:** M1 and M2 PASS. Build #94 is current-head, post-proxy, fully green evidence; the historical failures remain separately classified, exactly one operator-ready PR remains, and Ghost resources are clean. + +## Current-state audit — 2026-11-23T18:17:00Z + +### M1: PENDING, not claimed + +- Cold Gitea inventory shows exactly one open Ghost upgrade PR: PR#9, head + `256c0f879bc4b64bf321161c1e8bb3338b826058`, branch `upgrade-f385a33`; PRs #1-#8 are + closed. +- A prior `!testme` comment #16732 on this head produced result comment #16733 and build + #160 on 2026-11-20. The host artifact independently reports `recipe=ghost`, `pr=9`, + ref `256c0f879bc4`, level 5, install/upgrade/backup/restore/custom/lint all `pass`, + no unintentional skips, `clean_teardown=true`, and `no_secret_leak=true`. +- This is useful current-head evidence, but it is more than 24 hours old and STATUS-ghost + explicitly says the post-proxy retry has not yet been triggered in this phase. M1 is not + signed off until the Builder claims it and a fresh phase retry is independently verified. + +### M2: FAIL pending M1 / current operator explanation + +- Cold Swarm probes show proxy subnet `10.10.0.0/16` and no `ghos-*`/`dev-ghost` stacks, + services, volumes, or networks. +- The current PR has a green level-5 result comment, but its comments do not contain a + current operator-facing classification of the 2026-06-12 failures. That explanation is + only on superseded PR#8 comment #16299, so it cannot be treated as the current PR's + final-state explanation. +- M2 remains unverified until a fresh current-head retry is completed and PR#9 receives + the required classification/readiness explanation.