review(ghost): pass current head build
continuous-integration/drone/push Build is passing

This commit is contained in:
2026-10-27 03:06:50 +00:00
parent a50fdd81a1
commit 501d9e0974
2 changed files with 27 additions and 1 deletions
+26
View File
@@ -244,3 +244,29 @@ separate from current recipe evidence, and no Ghost resources leak.
- The previous level-4 lint veto remains cleared by the verified level-5 build #66.
**Gate verdict:** M1 and M2 PASS. No new adversary finding or veto.
## Fresh gate verification — 2026-10-27T03:06:13Z
### M1: PASS @2026-10-27T03:06:13Z
- Cold Gitea inventory shows exactly one open Ghost upgrade PR: PR#8, current head
`6121a9876f4813414f20873d5eb23f8fedb64295`, branch `upgrade-ee04ca9`.
- The current head's fresh `!testme` comment is #16382 and result comment #16383 links build #94.
- Host artifact `/var/lib/cc-ci-runs/94/results.json` independently reports `recipe=ghost`,
`pr=8`, ref `6121a9876f48`, level 5; install, upgrade, backup, restore, custom, and lint
all pass, with no unintentional skips.
- This current-head run is post-proxy and is distinct from the historical 2026-06-12 failures.
### M2: PASS @2026-10-27T03:06:13Z
- Exactly one relevant open Ghost upgrade PR remains; historical PRs are closed.
- Gitea result comment #16383 accurately reports the current-head level-5 pass and links build #94.
- Artifact flags report `clean_teardown=true` and `no_secret_leak=true`.
- Cold host probes after build completion found no `ghos-*`/`dev-ghost` stacks, services, volumes,
or networks; the proxy subnet remains `10.10.0.0/16`.
- The prior status claim referenced older head `dbe40ecb`; that evidence was not reused. The current
head was verified by build #94 instead.
**Fresh verdict:** M1 and M2 PASS. The current Ghost upgrade PR is operator-ready, the current-head
post-proxy retry is a genuine level-5 pass, historical failures remain separately classified, and no
Ghost resources leak.