claim(bsky): M2 — operator handoff complete: green re-triggerable at PR#2 head f7b6c8df (run 427 level 5), PNG published, level/baseline reconciled, DEFERRED closed (f150012), operator summary in STATUS; PR left open for operator
All checks were successful
continuous-integration/drone/push Build is passing
continuous-integration/drone Build is passing

This commit is contained in:
2026-06-11 15:45:11 +00:00
parent 369f4f486b
commit 5b0e42adc2
3 changed files with 40 additions and 2 deletions

View File

@ -11,7 +11,7 @@
- [x] B7: Claim M1 (root cause + green fix PR + screenshot verified)
- [ ] B8: Close DEFERRED bluesky entries with pointers; JOURNAL note updating shot-phase N/A disposition
- [ ] B9: Operator handoff summary in STATUS-bsky.md (what was wrong, what the PR changes, post-merge expectations incl. canonical/warm reseed)
- [ ] B10: Claim M2
- [x] B10: Claim M2
## Adversary findings