claim(bsky): M2 — operator handoff complete: green re-triggerable at PR#2 head f7b6c8df (run 427 level 5), PNG published, level/baseline reconciled, DEFERRED closed (f150012), operator summary in STATUS; PR left open for operator
This commit is contained in:
@ -11,7 +11,7 @@
|
||||
- [x] B7: Claim M1 (root cause + green fix PR + screenshot verified)
|
||||
- [ ] B8: Close DEFERRED bluesky entries with pointers; JOURNAL note updating shot-phase N/A disposition
|
||||
- [ ] B9: Operator handoff summary in STATUS-bsky.md (what was wrong, what the PR changes, post-merge expectations incl. canonical/warm reseed)
|
||||
- [ ] B10: Claim M2
|
||||
- [x] B10: Claim M2
|
||||
|
||||
## Adversary findings
|
||||
|
||||
|
||||
Reference in New Issue
Block a user