claim(bsky): M2 — operator handoff complete: green re-triggerable at PR#2 head f7b6c8df (run 427 level 5), PNG published, level/baseline reconciled, DEFERRED closed (f150012), operator summary in STATUS; PR left open for operator
All checks were successful
continuous-integration/drone/push Build is passing
continuous-integration/drone Build is passing

This commit is contained in:
2026-06-11 15:45:11 +00:00
parent 369f4f486b
commit 5b0e42adc2
3 changed files with 40 additions and 2 deletions

View File

@ -2,7 +2,37 @@
Phase SSOT: /srv/cc-ci/cc-ci-plan/plan-phase-bsky-fix.md
Gate: M1 — CLAIMED, awaiting Adversary.
Gate: M2 — CLAIMED, awaiting Adversary (M1: PASS @2026-06-11T12:30Z, REVIEW-bsky 369f4f4).
## M2 claim — operator handoff complete (2026-06-11T15:50Z)
WHAT (phase plan §3 M2, all builder-side items in place; the fresh cold pass is yours):
1. **Green at PR head, re-triggerable:** PR #2 head f7b6c8df unchanged since run 427
(level 5). HOW to re-run independently: post `!testme` on PR #2 — the bridge polls
~1 min, triggers a drone build, run dir /var/lib/cc-ci-runs/<n>. EXPECTED: level=5,
rungs install/backup_restore/functional/lint=pass, upgrade=skip with
skips.intentional.upgrade = the declared reason, clean_teardown+no_secret_leak=true,
screenshot.png = the PDS landing page. (cc-ci main also unchanged functionally since
e9745c8; HEAD at claim time: see this commit.)
2. **PNG to independently Read:** https://ci.commoninternet.net/runs/427/screenshot.png
(+ the fresh run's, if you re-trigger). EXPECTED: ASCII Bluesky butterfly landing
page, no credentials.
3. **Level under new semantics + baseline reconciled:** achieved level 5 (de-capped:
skip climbs), upgrade = declared intentional skip with re-enable path. Old baseline
"full lifecycle green" (Phase-2 e45e0ee, pre-results-era) reconciled: unreproducible
for upstream reasons (moving-tag republish broke ALL published versions); the PR
restores deployability; recorded in DEFERRED closure + JOURNAL-bsky 12:15Z entry.
4. **DEFERRED entries closed with pointers:** machine-docs/DEFERRED.md bluesky entry
marked RESOLVED @2026-06-11 (commit f150012) — explicitly closes BOTH the re-pin
follow-up and the rcust M2 baseline-exclusion note, with PR/run/registry pointers.
5. **Operator summary:** below in this file (what was wrong / what the PR changes /
post-merge steps 1-5 incl. version publish, EXPECTED_NA→UPGRADE_BASE_VERSION swap,
no canonical to reseed, never re-pin :0.4).
6. **PR left OPEN** for the operator (merged=false; immich PR#2/plausible PR#3 precedent).
WHERE: cc-ci main (STATUS/JOURNAL/BACKLOG-bsky, DEFERRED f150012, DECISIONS 2026-06-11
×2, harness e9745c8); mirror PR #2 head f7b6c8df; runs 427 (green) / 423 (negative
control); upstream registry cc-ci-plan/upstream/bluesky-pds.md @ f395247.
## M1 claim — root cause + green fix PR + screenshot (2026-06-11T12:05Z)