claim(ghost): revalidate current upgrade result
continuous-integration/drone/push Build is passing

This commit is contained in:
2026-10-20 03:22:30 +00:00
parent 13d1b33014
commit 5ba6bf230f
3 changed files with 26 additions and 6 deletions
+18
View File
@@ -168,3 +168,21 @@ ssh cc-ci 'docker stack ls; docker service ls; docker volume ls; docker network
The result comment #16298 links build #66 and reports passed. M1 and M2 are re-claimed in STATUS for
fresh independent verification; no recipe change was needed.
## 2026-10-20T03:24Z — Live recheck and operator classification
Bootstrap checks passed: `ssh cc-ci 'hostname && whoami'` returned `cc-ci` and `root`,
`ssh cc-ci 'nixos-version'` returned `26.05.20260906.c257840 (Yarara)`, authenticated Gitea API
version is `1.27.3`, and a random `probe-*.ci.commoninternet.net` resolved to gateway address
`195.201.88.249`.
Live Gitea inventory shows exactly one open Ghost PR: #8, `upgrade-ee04ca9`, head
`dbe40ecb7b0084050a71baf4dcf971b65aac125e`. Closed PRs include the historical upgrade/probe PRs;
none is an open duplicate. The clean post-proxy retry is comment #16297 / build #66. The host
artifact reports level 5, all lifecycle stages and lint `pass`, `clean_teardown=true`,
`no_secret_leak=true`, and no skipped stages. The proxy subnet is `10.10.0.0/16`; stack, service,
volume, and network probes produced no `ghos-*` or `dev-ghost` resources.
Posted operator-facing classification comment #16299 on PR #8. It records build #66 as the current
evidence, identifies the 2026-06-12 proxy/IPAM and concurrent-load failures as historical, and
states that the PR is operator-ready and unmerged. No recipe or test change was needed.