This commit is contained in:
@@ -35,5 +35,7 @@
|
||||
- [x] Record the fresh build verdict and classify the historical 2026-06-12 failures.
|
||||
- [x] Verify the sole operator-ready Ghost upgrade PR was upstreamed/released and closed; no duplicate or abandoned open PR remains.
|
||||
- [x] Verify no `ghos-*` or `dev-ghost` stacks, services, volumes, or networks remain.
|
||||
- [x] Remove stale warm Ghost volumes identified by the Adversary; post-cleanup probe returns no Ghost
|
||||
or `warm-ghost` volumes, stacks, services, or networks.
|
||||
- [x] Claim current M1 after fresh retry evidence is recorded.
|
||||
- [x] Claim current M2 after final operator-ready state is independently verified — awaiting fresh Adversary PASS for the upstreamed/closed outcome.
|
||||
|
||||
Reference in New Issue
Block a user