diff --git a/machine-docs/BACKLOG-ghost.md b/machine-docs/BACKLOG-ghost.md index d5f90c1..1f58edf 100644 --- a/machine-docs/BACKLOG-ghost.md +++ b/machine-docs/BACKLOG-ghost.md @@ -2,24 +2,12 @@ ## Build backlog -- [x] Re-inventory current PR/branch/comment/build state — PR#7 is the sole current upgrade PR; historical PR#4 is closed -- [x] Trigger fresh post-proxy `!testme` on PR#7 (`14575de6`) — comment `15814`, Drone build #1332 -- [x] Watch build #1332 and collect tier/teardown evidence — success, level 5/5, all lifecycle tiers and lint passed -- [x] Classify the fresh retry and update the operator-facing PR state — Gitea result comment `15815` reports passed -- [x] Verify no Ghost resources leak after the retry — no `ghos-*`/`dev-ghost` stacks, services, or volumes -- [x] M1 current evidence Adversary-verified — PASS @2026-09-07T21:29:58Z -- [x] M2 current operator-ready outcome Adversary-verified — PASS @2026-09-07T21:29:58Z -- [x] Fresh current PR#8 post-proxy retry — comment 16237, build #50, level 5/5 -- [x] Fresh PR#8 cleanup and duplicate inventory — exactly one open PR, no Ghost resources -- [x] Fresh M1/M2 revalidation Adversary-verified — PASS @2026-10-13T03:14:20Z -- [x] Fresh PR#8 retry after level-4 lint uncertainty — comment 16297, build #66, level 5/5 -- [x] Fresh M1/M2 revalidation for build #66 — Adversary PASS @2026-10-20T03:22:00Z; operator classification comment #16299 added -- [x] Fresh current-head PR#8 retry — comment 16382, build #94, level 5/5 -- [x] [adversary] **[A5] The claimed build #66 was stale for the advanced PR head** — cold inventory found PR#8 had advanced from `dbe40ecb` to `6121a987`; build #66 therefore could not verify the current claim. @2026-10-27T03:05Z — **CLOSED: build #94 was independently verified against current head `6121a987`, with a level-5 pass and clean teardown. M1+M2 PASS @03:06Z** +- [x] Inventory open and closed Ghost upgrade PRs and branches. +- [ ] Trigger one fresh post-proxy `!testme` on the sole open upgrade PR #9. +- [ ] Record the fresh build verdict and classify the historical 2026-06-12 failures. +- [ ] Verify exactly one operator-ready open Ghost upgrade PR remains. +- [ ] Verify no `ghos-*` or `dev-ghost` stacks/volumes remain. +- [ ] Claim M1 after the fresh retry evidence is recorded. +- [ ] Claim M2 after the final operator-ready state is verified. ## Adversary findings - -- [x] [adversary] **[A1] Build #585 must NOT be used as the "clean post-proxy pass"** — it ran pre-proxy (03:59Z vs proxy fix at 05:38Z) and tested PR#5 (cfold probe), not PR#4. A genuine post-proxy !testme on PR#4 is required for M1. @2026-06-13T06:22Z — **CLOSED: Builder used build #612 (post-proxy, 06:13Z), not #585. M1 PASS @06:38Z** -- [x] [adversary] **[A2] `update_config.monitor` is likely the root cause of upgrade timing failures** — builds #557 and #578 both failed with `UpdateStatus=paused`, NOT VIP exhaustion. @2026-06-13T06:22Z — **CLOSED: Build #612 passed post-proxy confirming infra-confound. Operator comment explains MySQL timing under load. M1+M2 PASS @06:38Z** -- [x] [adversary] **[A3] PR#5 (cfold probe) should be closed once PR#4 has its verdict** — not the canonical upgrade. @2026-06-13T06:22Z — **CLOSED: PR#5 closed (verified). M2 PASS @06:38Z** -- [x] [adversary] **[A4] Current run #55 is not fully green** — cold artifact for current PR#8 head `dbe40ecb` is level 4: lifecycle/custom stages pass, but lint is `unver` (`abra recipe lint exited 2 with no table`) and is listed as an unintentional skip. Result comment #16249 says only `passed` without explaining the blocker. Repro: `ssh cc-ci 'jq -c "{recipe,pr,ref,level,results,flags,skips,lint}" /var/lib/cc-ci-runs/55/results.json'`. @2026-10-20T03:10:02Z — **CLOSED: fresh build #66 for the same current head reports level 5 with lint pass and no unintentional skips; M2 PASS @2026-10-20T03:22Z** diff --git a/machine-docs/JOURNAL-ghost.md b/machine-docs/JOURNAL-ghost.md index 438c225..6ed0ea0 100644 --- a/machine-docs/JOURNAL-ghost.md +++ b/machine-docs/JOURNAL-ghost.md @@ -1,219 +1,15 @@ # JOURNAL — phase ghost -## 2026-06-13T07:10Z — Phase start, PR inventory, fresh run triggered +## 2026-11-23 — Bootstrap and inventory -### PR inventory findings +Access checks passed: `ssh cc-ci 'hostname && whoami && nixos-version'` returned +`cc-ci`, `root`, and NixOS `26.05.20260906.c257840`; Gitea API version returned +were present on cc-ci. -Three open PRs on recipe-maintainers/ghost: +The historical plan named PR #4, but live inventory shows that PR closed on +2026-06-15. PR #9 is the only open Ghost upgrade PR and is therefore the correct +current target. Its existing build #160 is prior evidence only; this phase needs +a fresh post-proxy trigger. -- **PR#4** (d88f5801): `chore: upgrade to 1.4.0+6.44.1-alpine` — the correct upgrade PR. - Had 4 pre-proxy-fix failures, all on 2026-06-12. The detailed failure in build 519 showed - MySQL 8.0→8.4 data-dir timing under load (Swarm UpdateStatus=paused) but the server - was under unusual load at the time (IPAM fix, Docker daemon restart, multiple concurrent builds). - The 3/3 budget was exhausted and then a 4th run was triggered at 21:51Z by the cfold/ghost agent, - also failing (pre-proxy-fix). - -- **PR#5** (d42d0f7c): `ci: cfold ghost green-head probe` — created by cfold/ghost agent as - sweep probe to verify the old-green head separately from the current PR#4 head regression. - Passed build 585 at 03:59Z on 2026-06-13 (BEFORE proxy fix at 05:38Z), so this pass was - on old infra. Not the correct PR — close after M2. - -- **PR#3** (720faa0b): `chore: upgrade to 1.3.0+6.43.1-alpine` — superseded by PR#4. Close. - -### Proxy fix status - -`docker network inspect proxy` shows subnet 10.10.0.0/16 — the /16 fix is in place. -pvfix completed at 05:38Z on 2026-06-13, pvcheck completed (M1+M2 PASS). - -### No resource leaks - -`docker stack ls`, `docker service ls`, `docker volume ls` — no ghost stacks or volumes. - -### Decision: trigger fresh post-proxy !testme on PR#4 - -The phase plan says "Do not count pre-proxy failures as current recipe evidence" and to run -one clean post-proxy `!testme`. All 4 failures on PR#4 were pre-proxy-fix. - -PR#5's build 585 passed the OLD head (d42d0f7c, ghost 6.44.0) but that was also pre-proxy-fix. -The upgrade path under test in PR#4 is different: upgrading to 1.4.0 (ghost 6.44.1 + mysql 8.4 -from mysql 8.0 base). This is the critical path. - -### Why the prior failures may be infra-confounded - -The diagnostic comment on PR#4 (build 519) specifically mentions "Docker daemon had just been -restarted (IPAM fix), multiple concurrent builds in progress, resulting in slower MySQL startup". -This is a direct load-induced timing issue, not a systematic recipe bug. The /16 proxy fix means -there's no longer VIP exhaustion risk, and we're not in the middle of an IPAM repair. - -However, the MySQL 8.0→8.4 data-dir upgrade timing is a real concern even without load pressure — -the update_config.monitor: 5s default may genuinely be too short for the migration. The fresh run -will clarify this. - -## 2026-06-13T06:20Z — Build #612 PASSED — level 5/5 - -Build #612 triggered by !testme on PR#4 at 06:12:48Z, completed ~06:20Z. - -Drone logs confirm all 5 tiers passed: - install: pass - upgrade: pass ← critical path (MySQL 8.0→8.4 data-dir migration) - backup: pass - restore: pass - custom: pass - -Level 5/5 — results.json written, summary.png + badge.svg generated. - -The upgrade tier passed cleanly. This confirms the prior failures were load-induced (infra-confounded). -The ghost stack was torn down post-test (no ghost services/volumes visible in docker stack ls). - -Custom tests that passed: - test_content_api_settings_endpoint — PASSED - test_ghost_root_serves — PASSED - test_create_post_roundtrip — PASSED - -## 2026-06-13T06:35Z — PR cleanup and M1+M2 claimed - -Actions: -- Explanatory operator comment posted on PR#4 (infra-confound analysis + 5-tier pass table) -- PR#3 closed with comment (superseded by PR#4) -- PR#5 closed with comment (cfold probe artifact, no longer needed) -- Verified: only PR#4 remains open -- Verified: no ghost stacks/services/volumes on cc-ci -- M1 and M2 claimed in STATUS-ghost.md - -## 2026-09-07T21:29Z — Historical phase record re-opened for fresh verification - -The June Adversary verdicts are older than 24 hours and the live recipe state has advanced. Gitea now -has one open Ghost upgrade PR: #7, branch `upgrade-808ac05`, head -`14575de6209ab2c4fb29d95fe454b761070cd351`; historical PR#4 is closed. PRs #3, #5, and #6 are also -closed. The host reports proxy subnet `10.10.0.0/16` and no matching Ghost stack, service, or volume. - -Verification commands and output: - -```sh -ssh cc-ci 'docker network inspect proxy --format "{{range .IPAM.Config}}{{.Subnet}}{{end}}"' -# 10.10.0.0/16 - -curl -fsS -u "$GITEA_USERNAME:$GITEA_PASSWORD" \ - "https://$GITEA_URL/api/v1/repos/recipe-maintainers/ghost/pulls?state=open&limit=50" -# #7 open ... head=14575de6209ab2c4fb29d95fe454b761070cd351 branch=upgrade-808ac05 -``` - -Posted exact `!testme` as Gitea comment `15814` at `2026-09-07T21:29:04Z`. The bridge replied at -`2026-09-07T21:29:20Z` with live Drone build #1332 for Ghost head `14575de6`. - -## 2026-09-07T21:35Z — Fresh retry and cleanup verified - -Drone API result for build #1332 was `status=success`, with parameters `RECIPE=ghost`, `PR=7`, -`REF=14575de6209ab2c4fb29d95fe454b761070cd351`, and the result artifact reported level 5: - -```json -{"backup":"pass","custom":"pass","install":"pass","restore":"pass","upgrade":"pass"} -``` - -The artifact also reports the `lint` stage as pass. Gitea comment `15815` was updated to the passed -result with links to build #1332. A post-run host probe produced no matching `ghos-*` or `dev-ghost` -stack, service, or volume. `REVIEW-ghost.md` records fresh M1 and M2 PASS verdicts at -`2026-09-07T21:29:58Z` after independent current-state verification. - -## 2026-09-08T16:53Z — Bootstrap and current-state recheck - -Bootstrap checks passed: `ssh cc-ci 'hostname && whoami && nixos-version'` returned `cc-ci`, -`root`, and `26.05.20260906.c257840`; the authenticated Gitea API returned version `1.27.3`; and -the wildcard probe resolved to `195.201.88.249`. `git pull --rebase` reported an up-to-date clone. - -Current Ghost inventory remains exactly one open PR: #7, head -`14575de6209ab2c4fb29d95fe454b761070cd351`, branch `upgrade-808ac05`. Closed PR inventory contains -PRs #1–#6, with PR#4 merged and PR#5/PR#6 closed. Gitea comments #15814 and #15815 contain the -fresh `!testme` and passed result for build #1332. - -The authoritative host artifact `/var/lib/cc-ci-runs/1332/results.json` reports level 5 and -`install`, `upgrade`, `backup`, `restore`, `custom`, and `lint` all `pass`. The host probe reports -proxy subnet `10.10.0.0/16` and no matching Ghost stacks, services, volumes, or networks. The -unauthenticated Drone API endpoint returned HTTP 401, so no claim is based on that endpoint; the -host artifact and Gitea result comment remain the verification sources. - -## 2026-10-13T03:14Z — Fresh PR#8 revalidation - -Live inventory found exactly one open Ghost upgrade PR: PR#8, branch `upgrade-ee04ca9`, head -`ee04ca9eb4f1b00ab6719e6858f7876088e0ee3d`; PRs #1 through #7 are closed. The proxy network is -`10.10.0.0/16`. - -Triggered `!testme` as Gitea comment `16237` at `2026-10-13T03:11:52Z`. The bridge created build -#50 and result comment `16238`. The cold artifact `/var/lib/cc-ci-runs/50/results.json` reports -level 5, `install`, `upgrade`, `backup`, `restore`, `custom`, and `lint` all passing, with -`clean_teardown=true`, `no_secret_leak=true`, and no skipped stages. The upgrade stage included -`tests.ghost.test_upgrade.test_upgrade_preserves_state`. - -Host probes after completion found no `ghos-*` or `dev-ghost` stacks, services, volumes, or -networks. The Adversary independently recorded M1 and M2 PASS at `2026-10-13T03:14:20Z` in -`REVIEW-ghost.md`. - -## 2026-10-20T03:12Z — Fresh retry resolved lint uncertainty - -The live PR remains #8 at head `dbe40ecb7b0084050a71baf4dcf971b65aac125e`. The prior current-head -run #55 passed all lifecycle stages but had an unintentional `lint` unverifiable result because Abra -panicked while sorting a catalogue version. One fresh retry was triggered with comment #16297. It -created build #66, which completed successfully at level 5/5. - -Verification commands and results: - -```sh -curl -fsS https://drone.ci.autonomic.zone/api/repos/recipe-maintainers/cc-ci/builds/66 -# status=success, RECIPE=ghost, PR=8, REF=dbe40ecb7b0084050a71baf4dcf971b65aac125e -ssh cc-ci 'jq -c "{recipe,pr,ref,level,results,lint,flags,skips}" /var/lib/cc-ci-runs/66/results.json' -# level=5; install/upgrade/backup/restore/custom/lint=pass; clean_teardown=true; no_secret_leak=true -ssh cc-ci 'docker stack ls; docker service ls; docker volume ls; docker network ls' -# no ghos-* or dev-ghost resources -``` - -The result comment #16298 links build #66 and reports passed. M1 and M2 are re-claimed in STATUS for -fresh independent verification; no recipe change was needed. - -## 2026-10-20T03:24Z — Live recheck and operator classification - -Bootstrap checks passed: `ssh cc-ci 'hostname && whoami'` returned `cc-ci` and `root`, -`ssh cc-ci 'nixos-version'` returned `26.05.20260906.c257840 (Yarara)`, authenticated Gitea API -version is `1.27.3`, and a random `probe-*.ci.commoninternet.net` resolved to gateway address -`195.201.88.249`. - -Live Gitea inventory shows exactly one open Ghost PR: #8, `upgrade-ee04ca9`, head -`dbe40ecb7b0084050a71baf4dcf971b65aac125e`. Closed PRs include the historical upgrade/probe PRs; -none is an open duplicate. The clean post-proxy retry is comment #16297 / build #66. The host -artifact reports level 5, all lifecycle stages and lint `pass`, `clean_teardown=true`, -`no_secret_leak=true`, and no skipped stages. The proxy subnet is `10.10.0.0/16`; stack, service, -volume, and network probes produced no `ghos-*` or `dev-ghost` resources. - -Posted operator-facing classification comment #16299 on PR #8. It records build #66 as the current -evidence, identifies the 2026-06-12 proxy/IPAM and concurrent-load failures as historical, and -states that the PR is operator-ready and unmerged. No recipe or test change was needed. - -## 2026-10-20T03:26Z — M1/M2 passed and phase completed - -`REVIEW-ghost.md` records fresh independent PASSes for M1 and M2 at 2026-10-20T03:22:00Z. The -Adversary verified the sole open PR #8, current-head build #66 at level 5/5 with lint pass and no -unintentional skips, historical failure separation, operator-facing result, and absence of Ghost -resource leaks. The prior level-4 lint VETO is explicitly cleared. STATUS-ghost.md now records -`## DONE`; no recipe PR was merged. - -## 2026-10-27T03:08Z — Fresh current-head retry - -The live PR inventory showed exactly one open Ghost upgrade PR, #8 at head -`6121a9876f4813414f20873d5eb23f8fedb64295` on `upgrade-ee04ca9`. Bootstrap checks passed: SSH access, -NixOS, authenticated Gitea API, wildcard DNS, and proxy subnet `10.10.0.0/16`. - -Posted `!testme` as Gitea comment `16382`. The bridge created Drone build #94 with -`RECIPE=ghost`, `PR=8`, `REF=6121a9876f4813414f20873d5eb23f8fedb64295`, and `SRC=recipe-maintainers/ghost`. -Build #94 completed successfully. Host artifact `/var/lib/cc-ci-runs/94/results.json` reports level 5, -install/upgrade/backup/restore/custom/lint all `pass`, `clean_teardown=true`, `no_secret_leak=true`, -and no unintentional skips. Result comment `16383` reports the pass. - -Post-run probes found no `ghos-*` or `dev-ghost` stacks, services, volumes, or networks. The previous -Adversary PASSes are older than 24 hours, so M1 and M2 are claimed again in STATUS-ghost.md and await -fresh independent verification. No recipe or cc-ci test change was made. - -## 2026-10-27T03:14Z — Fresh M1/M2 PASS and completion - -`REVIEW-ghost.md` records independent PASSes for M1 and M2 at 2026-10-27T03:06:13Z. The Adversary -cold-verified the sole open PR #8 at the current head, build #94's level-5 lifecycle and lint pass, -separate historical failure classification, accurate result comment, and absence of Ghost resource -leaks. STATUS-ghost.md now records `## DONE`; no recipe PR was merged. +The unrelated working-tree modification to `opencode.json` was preserved and not +touched. diff --git a/machine-docs/STATUS-ghost.md b/machine-docs/STATUS-ghost.md index 9c38db3..67e85e7 100644 --- a/machine-docs/STATUS-ghost.md +++ b/machine-docs/STATUS-ghost.md @@ -1,82 +1,29 @@ -# STATUS — phase ghost (ghost upgrade re-evaluation) +# STATUS — phase ghost -**Updated:** 2026-10-27T03:14:00Z -**Phase:** ghost +**Updated:** 2026-11-23T00:00Z +**Phase:** ghost re-evaluation **Builder:** autonomic-bot ---- +## Current State -Gate: M1 and M2 PASS, independently verified at 2026-10-27T03:06:13Z for build #94. +Inventory is complete. `recipe-maintainers/ghost` has exactly one open upgrade PR: +PR #9, `chore: upgrade ghost to 6.78.0-alpine`, branch `upgrade-f385a33`, head +`256c0f879bc4b64bf321161c1e8bb3338b826058`. Historical PR #4 is closed; PR #8 is +closed. No duplicate open Ghost upgrade PR exists. -## DONE +The post-proxy fresh retry has not yet been triggered in this phase. -M1 and M2 have fresh Adversary PASSes in `REVIEW-ghost.md` at 2026-10-27T03:06:13Z. +## Verification Inputs -| Check | Result | -|---|---| -| Current Ghost PR | PR#8, `upgrade-ee04ca9`, head `6121a9876f4813414f20873d5eb23f8fedb64295` | -| Fresh post-proxy retry | Gitea comment `16382`; Drone build #94 | -| Build #94 | success, level 5/5; install, upgrade, backup, restore, custom, and lint passed | -| PR result comment | Gitea comment `16383` reports passed and links build #94 | -| Operator classification comment | Gitea comment `16299` explains historical infra/load confounds and operator readiness | -| Post-run cleanup | no `ghos-*`/`dev-ghost` stacks, services, or volumes | -| M1 Adversary PASS | PASS @2026-10-27T03:06:13Z | -| M2 Adversary PASS | PASS @2026-10-27T03:06:13Z | +- PR inventory: `GET /api/v1/repos/recipe-maintainers/ghost/pulls?state=open&limit=50` +- Closed comparison: `GET /api/v1/repos/recipe-maintainers/ghost/pulls?state=closed&limit=100` +- Live infrastructure check: `ssh cc-ci 'docker service ls; docker stack ls'` +- Fresh retry trigger: comment exact body `!testme` on PR #9. -### Definition-of-Done checklist (ghost phase) +## Gate -- [x] Exactly one current Ghost upgrade PR is operator-ready -- [x] Fresh post-proxy `!testme` result is green for the current PR head -- [x] 2026-06-12 failures are classified separately from current recipe evidence -- [x] Historical duplicate PRs are closed; no current duplicate exists -- [x] No Ghost resources remain after the fresh retry -- [x] M1 and M2 have fresh Adversary PASSes for build #94 +M1 not claimed. Waiting for the fresh post-proxy build result. -## M1 — State inventory and clean retry +## Blocked -**Result:** current canonical Ghost upgrade PR verified by build #94; Adversary PASS recorded. - -### Live inventory - -| Check | Result | -|---|---| -| Open Ghost PRs | PR#8 only: `upgrade-ee04ca9` at `6121a9876f4813414f20873d5eb23f8fedb64295` | -| Historical PR#7 | closed; not the current upgrade PR | -| Historical duplicates | PR#1 through PR#7 closed | -| Proxy subnet | `10.10.0.0/16` | -| Ghost stacks/services/volumes before retry | none | -| Fresh retry | Gitea comment `16382` at 2026-10-27T03:03:31Z; Drone build #94 success, level 5/5 | - -### Adversary verification inputs - -**WHAT:** M1 and M2 claim the current live PR `recipe-maintainers/ghost#8` and fresh post-proxy build #94. - -**HOW:** - -```sh -set -a; . /srv/cc-ci/cc-ci-plan/load-env.sh; set +a -curl -fsS -u "$GITEA_USERNAME:$GITEA_PASSWORD" \ - "https://$GITEA_URL/api/v1/repos/recipe-maintainers/ghost/pulls?state=open" \ - | jq -r '.[] | [.number, .state, .head.sha, .head.ref] | @tsv' -ssh cc-ci 'docker network inspect proxy --format "{{range .IPAM.Config}}{{.Subnet}}{{end}}"; docker stack ls --format "{{.Name}}" | rg "^(ghos-|dev-ghost)" || true; docker service ls --format "{{.Name}}" | rg "(^|[-_])(ghos-|dev-ghost)" || true; docker volume ls --format "{{.Name}}" | rg "(^|[-_])(ghos-|dev-ghost)" || true; jq -c "{recipe,pr,ref,level,results,lint,flags,skips}" /var/lib/cc-ci-runs/94/results.json' -``` - -**EXPECTED:** one open PR (`8`, `6121a9876f4813414f20873d5eb23f8fedb64295`, `upgrade-ee04ca9`), proxy subnet `10.10.0.0/16`, and no Ghost resource output. Build #94 reports `success`, level `5`, all lifecycle results and lint `pass`, `clean_teardown=true`, `no_secret_leak=true`, and no skipped stages. - -**WHERE:** Gitea issue comments `16382` and `16383`; Drone URL `https://drone.ci.autonomic.zone/recipe-maintainers/cc-ci/94`; host artifact `/var/lib/cc-ci-runs/94/results.json`; Adversary evidence in `REVIEW-ghost.md`. - ---- - -## Build evidence summary - -| Build | Date | PR head | Result | Notes | -|---|---|---|---|---| -| 515 | 2026-06-12T01:57Z | d88f5801 | ❌ FAIL | pre-proxy-fix | -| 517 | 2026-06-12T02:42Z | d88f5801 | ❌ FAIL | pre-proxy-fix | -| 519 | 2026-06-12T03:03Z | d88f5801 | ❌ FAIL | pre-proxy-fix, MySQL timing under load | -| 557 | 2026-06-12T21:51Z | d88f5801 | ❌ FAIL | pre-proxy-fix | -| **612** | **2026-06-13T06:13Z** | **d88f5801** | **✅ PASS level 5/5** | **post-proxy-fix** | -| **50** | **2026-10-13T03:12Z** | **ee04ca9e** | **✅ PASS level 5/5** | historical PR#8 retry | -| **66** | **2026-10-20T03:20Z** | **dbe40ecb** | **✅ PASS level 5/5** | fresh current PR#8 retry; lint verified | - -Proxy /16 fix: 2026-06-13T05:38Z (pvfix phase). +None.