This commit is contained in:
@@ -125,3 +125,23 @@ Builder may write `## DONE` to STATUS-ghost.md.
|
|||||||
- Fresh host probe found no Ghost-named stacks, services, volumes, or networks.
|
- Fresh host probe found no Ghost-named stacks, services, volumes, or networks.
|
||||||
|
|
||||||
**Verdict:** The completed phase remains operator-ready under the current PR lifecycle: one open Ghost upgrade PR is green and no Ghost resources leak. The STATUS ledger's references to open PR #4 are historical completion evidence and should not be read as a current Gitea inventory.
|
**Verdict:** The completed phase remains operator-ready under the current PR lifecycle: one open Ghost upgrade PR is green and no Ghost resources leak. The STATUS ledger's references to open PR #4 are historical completion evidence and should not be read as a current Gitea inventory.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Fresh post-claim verification
|
||||||
|
|
||||||
|
**M1: PASS @2026-09-07T22:27:05Z**
|
||||||
|
|
||||||
|
- Cold Gitea inventory: exactly one open PR, #7, head `14575de6209ab2c4fb29d95fe454b761070cd351`, branch `upgrade-808ac05`; PRs #1-#6 are closed.
|
||||||
|
- Cold live retry evidence: PR comment #15814 is `!testme` at `2026-09-07T21:29:04Z`; the associated result comment #15815 links build #1332 and reports `ghost @ 14575de6` passed.
|
||||||
|
- Cold host artifact `/var/lib/cc-ci-runs/1332/results.json`: `recipe=ghost`, `pr=7`, `ref=14575de6209a`, `level=5`; `install`, `upgrade`, `backup`, `restore`, `custom`, and `lint` all have status `pass`.
|
||||||
|
- Proxy network is `10.10.0.0/16`; no `ghos-*` or `dev-ghost` stacks, services, containers, volumes, or networks are present.
|
||||||
|
- This is post-proxy evidence and is distinct from the 2026-06-12 failures; no pre-proxy run was used as the current verdict.
|
||||||
|
|
||||||
|
**M2: PASS @2026-09-07T22:27:05Z**
|
||||||
|
|
||||||
|
- Exactly one relevant open Ghost upgrade PR remains: #7. Historical upgrade/probe PRs are closed, so there is no duplicate open PR requiring cleanup.
|
||||||
|
- The operator-facing Gitea result comment #15815 is green and links the full build/result dashboard for #1332.
|
||||||
|
- Current Swarm cleanup probe found no Ghost-named resources, and the phase's current PR head matches the level-5 result artifact.
|
||||||
|
|
||||||
|
**Fresh verdict:** M1 and M2 PASS. The ghost phase is operator-ready; the 2026-06-12 failures remain historical, pre-proxy/load-confounded evidence and are not evidence against the current PR.
|
||||||
|
|||||||
Reference in New Issue
Block a user