review(ghost): fail current gates on leak and closed PR
continuous-integration/drone/push Build is failing
continuous-integration/drone/push Build is failing
This commit is contained in:
@@ -19,8 +19,10 @@
|
||||
|
||||
## Adversary findings
|
||||
|
||||
- [ ] [adversary] **[A6] Current phase lacks a fresh post-proxy retry** — PR#9 head `256c0f879bc4b64bf321161c1e8bb3338b826058` has build #160 from 2026-11-20, but that run is over 24 hours old and STATUS-ghost says no retry has been triggered in this phase. Repro: inspect PR#9 comments #16732/#16733 and `/var/lib/cc-ci-runs/160/results.json`; trigger a new exact `!testme` and verify the resulting build against the unchanged/current head. @2026-11-23T18:17Z
|
||||
- [ ] [adversary] **[A7] Current PR lacks operator-facing historical classification** — PR#9's result comment #16733 reports only the green build; the required explanation separating the 2026-06-12 proxy/IPAM and load/timing failures is present only on superseded PR#8 comment #16299. Add an accurate classification/readiness comment to PR#9 after the fresh retry. @2026-11-23T18:17Z
|
||||
- [x] [adversary] **[A6] Current phase lacked a fresh post-proxy retry** — resolved by exact comment #16787 and current-head build #173; independently verified 2026-11-23T18:26Z.
|
||||
- [x] [adversary] **[A7] Current PR lacked operator-facing historical classification** — resolved by classification comment #16795; independently verified 2026-11-23T18:26Z.
|
||||
- [ ] [adversary] **[A8] Build #173 leaves a Ghost volume and lacks teardown/leak metadata** — `ssh cc-ci 'docker volume ls --format "{{.Name}}" | grep -E "(^|_)(ghos|dev-ghost)"'` returns `warm-ghost_ci_commoninternet_net_ghost_content`; `/var/lib/cc-ci-runs/173/results.json` has `clean_teardown=null` and `no_secret_leak=null` despite STATUS expecting `true`. Reproduce after build #173; Builder must account for/remove the volume and provide verified cleanup/leak evidence.
|
||||
- [ ] [adversary] **[A9] No open operator-ready Ghost PR remains** — cold Gitea inventory at 2026-11-23T18:26Z returns zero open Ghost upgrade PRs; PR #9 closed at 18:22Z after comment #16799. Phase DoD requires exactly one open operator-ready PR. Restore that state or obtain an explicit phase-plan decision before DONE.
|
||||
- [x] [adversary] **[A1] Build #585 must NOT be used as the "clean post-proxy pass"** — it ran pre-proxy (03:59Z vs proxy fix at 05:38Z) and tested PR#5 (cfold probe), not PR#4. A genuine post-proxy !testme on PR#4 is required for M1. @2026-06-13T06:22Z — **CLOSED: Builder used build #612 (post-proxy, 06:13Z), not #585. M1 PASS @06:38Z**
|
||||
- [x] [adversary] **[A2] `update_config.monitor` is likely the root cause of upgrade timing failures** — builds #557 and #578 both failed with `UpdateStatus=paused`, NOT VIP exhaustion. @2026-06-13T06:22Z — **CLOSED: Build #612 passed post-proxy confirming infra-confound. Operator comment explains MySQL timing under load. M1+M2 PASS @06:38Z**
|
||||
- [x] [adversary] **[A3] PR#5 (cfold probe) should be closed once PR#4 has its verdict** — not the canonical upgrade. @2026-06-13T06:22Z — **CLOSED: PR#5 closed (verified). M2 PASS @06:38Z**
|
||||
|
||||
Reference in New Issue
Block a user