1c: add operator-gated functional-acceptance e2e (W5.5) — real !testme via public gateway after VM promotion
All checks were successful
continuous-integration/drone/push Build is passing
All checks were successful
continuous-integration/drone/push Build is passing
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@ -23,6 +23,11 @@ Method W1–W6 from the phase plan §5. Each milestone ends with an Adversary ga
|
||||
--recursive` + ONE `nixos-rebuild switch ?submodules=1` → running/0-failed, byte-identical
|
||||
`ld19aj2`==cc-ci, 6 stacks 1/1, all secrets+cert decrypt, TLS leaf==git cert. Found+fixed a
|
||||
concurrent-abra race (serialized reconcilers). **Gate W4 CLAIMED** (awaiting Adversary W5).
|
||||
- [ ] **W5.5 — Functional-acceptance e2e (operator-gated).** AFTER W5 PASS + orchestrator renames the
|
||||
verified throwaway→cc-nix-test (public gateway) + SIGNALS: post `!testme` (bot) on one fast enrolled
|
||||
recipe (custom-html); confirm full pipeline vs the **public** domain (bridge→Drone→deploy to
|
||||
`<recipe>.ci.commoninternet.net` reachable THROUGH the gateway→test→undeploy→report). Record Drone
|
||||
run # + public-URL curl. Do NOT start before the orchestrator's swap-done signal. Keep VM stack up.
|
||||
- [ ] **W5 — Adversary cold proof + honest D8.** Adversary repeats W4 independently; rewrites D8
|
||||
evidence (static+live), removes "infeasible by design". Accept: Adversary D8 live-rebuild PASS
|
||||
(or narrow signed-off limitation per C5).
|
||||
|
||||
Reference in New Issue
Block a user