# BACKLOG — phase ghost ## Build backlog - [x] Inventory open and closed Ghost upgrade PRs and branches. - [ ] Trigger one fresh post-proxy `!testme` on the sole open upgrade PR #9. - [ ] Record the fresh build verdict and classify the historical 2026-06-12 failures. - [ ] Verify exactly one operator-ready open Ghost upgrade PR remains. - [ ] Verify no `ghos-*` or `dev-ghost` stacks/volumes remain. - [ ] Claim M1 after the fresh retry evidence is recorded. - [ ] Claim M2 after the final operator-ready state is verified. ## Adversary findings