REVIEW — phase ghost (Adversary)
Cold reconnaissance — 2026-06-13T06:20Z
Scope: Pre-Builder independent probe of ghost PR/build state.
Source of truth: phase plan plan-phase-ghost-reeval.md §Gates / DoD.
What was checked
- Gitea API: all open/closed PRs on
recipe-maintainers/ghost - ci.commoninternet.net ghost run history: builds #515–#585
- Drone build logs (read directly via Drone sqlite DB): builds #557, #578, #585
- cc-ci host: docker stacks/volumes/services matching "ghost"
/tmp/ghost-render/compose.ccci.ymloverlay contents
Pre-claim findings
F1 — Upgrade failure mode is MySQL timing, NOT VIP exhaustion.
Builds #557 and #578 both show: "!! upgrade op failed: ... UpdateStatus='paused'" — recipe-level timing failure. Not VIP exhaustion (which would be tasks stuck in New state).
F2 — Build #585 pre-proxy, wrong PR. Ran at ~04:14Z (84 min before proxy fix at 05:38Z). Tested PR#5 (d42d0f7c), not PR#4 (d88f5801).
F3 — No post-proxy ghost runs as of 06:20Z. Builder needed to trigger a fresh run.
F4 — MySQL timing is load-sensitive. Same sha: #578 failed at ~03:00Z, #585 passed at ~04:00Z. Suggests server load was the variable.
F5 — PR#5 is cfold artifact. Should be closed after PR#4 verdict.
F6/F7 — Clean state. No ghost leaks; all recent runs have clean_teardown=true, no_secret_leak=true.
M1 — State inventory and clean retry
PASS @2026-06-13T06:38Z
Cold acceptance run
Adversary independently verified the following from a cold start (own clone, own SSH session, no Builder state shared):
1. Correct PR identified: PR#4 (d88f5801)
- Gitea API confirms PR#4 is the only open PR, titled "chore: upgrade to 1.4.0+6.44.1-alpine"
- PR#5 (cfold probe) now closed ✅
2. Pre-proxy failures confirmed infra-confounded
- Builds 515, 517, 519, 557: all dated 2026-06-12, before proxy /16 fix at 05:38Z on 2026-06-13 ✅
- Builds 515/517 were L0 (possible VIP exhaustion at deploy stage); builds 519/557 were L1 with
UpdateStatus=paused(MySQL timing under high load from concurrent IPAM-fix operations) - Builder's classification as "infra-confounded" is correct
3. Fresh post-proxy !testme on PR#4 verified
- Gitea PR#4 comment:
@autonomic-bot [2026-06-13T06:12:48Z]: !testme(post-proxy ✅, proxy fixed 05:38Z) - Drone build #612:
started=2026-06-13T06:13:02Z(from Drone sqlite DB) — 35 min after proxy fix ✅ RECIPE=ghost REF=d88f5801✅build_status=success✅
4. Build #612 genuine L5/5 pass verified
/var/lib/cc-ci-runs/612/results.json:level=5, all stages pass (install/upgrade/backup/restore/custom) ✅- JUnit timestamps confirm genuine sequential execution:
- install: 06:13:53Z (51s from start)
- upgrade: 06:14:38Z (1m36s from start)
- backup: 06:14:43Z
- restore: 06:14:49Z
- custom: 06:14:50–53Z
clean_teardown=True,no_secret_leak=True✅- Badge:
https://ci.commoninternet.net/runs/612/badge.svg→ level 5 ✅ - Proxy subnet confirmed:
10.10.0.0/16✅
Evidence source: all checks run independently by Adversary against Gitea API, cc-ci Drone sqlite, cc-ci run log files, and cc-ci docker state.
M2 — Operator-ready outcome
PASS @2026-06-13T06:38Z
Cold acceptance run
1. Exactly 1 open PR on ghost: PR#4
GET /api/v1/repos/recipe-maintainers/ghost/pulls?state=open→ 1 result: PR#4 (d88f5801) ✅
2. PR#3 closed
GET /api/v1/repos/recipe-maintainers/ghost/pulls/3→state=closed✅
3. PR#5 closed
GET /api/v1/repos/recipe-maintainers/ghost/pulls/5→state=closed✅
4. No ghost resource leaks
docker stack ls | grep ghos= nothing ✅docker service ls | grep ghos= nothing ✅docker volume ls | grep ghos= nothing ✅
5. Operator comment on PR#4
- Comment at 2026-06-13T06:22:11Z (note: STATUS says 06:35Z — minor discrepancy, not blocking)
- Content: 5-tier pass table, infra-confound analysis, "This PR is operator-ready. Nothing was merged." ✅
6. Adversary findings from BACKLOG addressed:
- A1: Build #585 NOT used as post-proxy pass — Builder used #612 (post-proxy) ✅
- A2: MySQL timing acknowledged in operator comment; upgrade passed post-proxy confirming infra-confound ✅
- A3: PR#5 closed ✅
Verdict
Both M1 and M2 PASS. The ghost phase Definition of Done is met:
- Exactly one ghost upgrade PR (PR#4) is operator-ready
- Fresh post-proxy verdict: PASS (build #612, level 5/5)
- 2026-06-12 failures correctly classified as infra-confounded (proxy /24 IPAM pressure + load)
- No stale stacks/volumes
- Operator-facing explanation present on the PR
Builder may write ## DONE to STATUS-ghost.md.
Post-completion revalidation
M1: PASS @2026-09-07T21:29:58Z
- Cold-read the historical M1 evidence: build #612's live artifact remains available on cc-ci and reports
recipe=ghost,pr=4,ref=d88f5801, level 5, with install, upgrade, backup, restore, custom, and lint all passing. - The original pre-proxy classification remains time-valid: build #612 was recorded after the proxy /16 change, and no Ghost resources exist on the current Swarm host.
M2: PASS @2026-09-07T21:29:58Z
- Live Gitea inventory now has exactly one open Ghost upgrade PR: #7,
chore: upgrade ghost to 6.62.0-alpine, head14575de6209ab2c4fb29d95fe454b761070cd351. PR #4 was subsequently merged after this phase completed; this is an external lifecycle change, not a duplicate left by the phase. - The current PR's head has a genuine level-5 lifecycle artifact:
https://ci.commoninternet.net/runs/1316/results.jsonreportsrecipe=ghost,pr=7,ref=14575de6209a, with install, upgrade, backup, restore, custom, and lint all passing. - Fresh host probe found no Ghost-named stacks, services, volumes, or networks.
Verdict: The completed phase remains operator-ready under the current PR lifecycle: one open Ghost upgrade PR is green and no Ghost resources leak. The STATUS ledger's references to open PR #4 are historical completion evidence and should not be read as a current Gitea inventory.