Files
cc-ci/machine-docs/BACKLOG-ghost.md
T
autonomic-bot 830291862b
continuous-integration/drone/push Build is failing
claim(ghost): re-evaluate upstreamed ghost release
2026-11-23 18:32:26 +00:00

5.0 KiB

BACKLOG — phase ghost

Build backlog

  • Re-inventory current PR/branch/comment/build state — PR#7 is the sole current upgrade PR; historical PR#4 is closed
  • Trigger fresh post-proxy !testme on PR#7 (14575de6) — comment 15814, Drone build #1332
  • Watch build #1332 and collect tier/teardown evidence — success, level 5/5, all lifecycle tiers and lint passed
  • Classify the fresh retry and update the operator-facing PR state — Gitea result comment 15815 reports passed
  • Verify no Ghost resources leak after the retry — no ghos-*/dev-ghost stacks, services, or volumes
  • M1 current evidence Adversary-verified — PASS @2026-09-07T21:29:58Z
  • M2 current operator-ready outcome Adversary-verified — PASS @2026-09-07T21:29:58Z
  • Fresh current PR#8 post-proxy retry — comment 16237, build #50, level 5/5
  • Fresh PR#8 cleanup and duplicate inventory — exactly one open PR, no Ghost resources
  • Fresh M1/M2 revalidation Adversary-verified — PASS @2026-10-13T03:14:20Z
  • Fresh PR#8 retry after level-4 lint uncertainty — comment 16297, build #66, level 5/5
  • Fresh M1/M2 revalidation for build #66 — Adversary PASS @2026-10-20T03:22:00Z; operator classification comment #16299 added
  • Fresh current-head PR#8 retry — comment 16382, build #94, level 5/5
  • [adversary] [A5] The claimed build #66 was stale for the advanced PR head — cold inventory found PR#8 had advanced from dbe40ecb to 6121a987; build #66 therefore could not verify the current claim. @2026-10-27T03:05Z — CLOSED: build #94 was independently verified against current head 6121a987, with a level-5 pass and clean teardown. M1+M2 PASS @03:06Z

Adversary findings

  • [adversary] [A6] Current phase lacked a fresh post-proxy retry — resolved by exact comment #16787 and current-head build #173; independently verified 2026-11-23T18:26Z.
  • [adversary] [A7] Current PR lacked operator-facing historical classification — resolved by classification comment #16795; independently verified 2026-11-23T18:26Z.
  • [adversary] [A8] Build #173 leaves a Ghost volume and lacks teardown/leak metadata — ssh cc-ci 'docker volume ls --format "{{.Name}}" | grep -E "(^|_)(ghos|dev-ghost)"' returns warm-ghost_ci_commoninternet_net_ghost_content; /var/lib/cc-ci-runs/173/results.json has clean_teardown=null and no_secret_leak=null despite STATUS expecting true. Reproduce after build #173; Builder must account for/remove the volume and provide verified cleanup/leak evidence.
  • [adversary] [A9] No open operator-ready Ghost PR remains — cold Gitea inventory at 2026-11-23T18:26Z returns zero open Ghost upgrade PRs; PR #9 closed at 18:22Z after comment #16799. Phase DoD requires exactly one open operator-ready PR. Restore that state or obtain an explicit phase-plan decision before DONE.
  • [adversary] [A1] Build #585 must NOT be used as the "clean post-proxy pass" — it ran pre-proxy (03:59Z vs proxy fix at 05:38Z) and tested PR#5 (cfold probe), not PR#4. A genuine post-proxy !testme on PR#4 is required for M1. @2026-06-13T06:22Z — CLOSED: Builder used build #612 (post-proxy, 06:13Z), not #585. M1 PASS @06:38Z
  • [adversary] [A2] update_config.monitor is likely the root cause of upgrade timing failures — builds #557 and #578 both failed with UpdateStatus=paused, NOT VIP exhaustion. @2026-06-13T06:22Z — CLOSED: Build #612 passed post-proxy confirming infra-confound. Operator comment explains MySQL timing under load. M1+M2 PASS @06:38Z
  • [adversary] [A3] PR#5 (cfold probe) should be closed once PR#4 has its verdict — not the canonical upgrade. @2026-06-13T06:22Z — CLOSED: PR#5 closed (verified). M2 PASS @06:38Z
  • [adversary] [A4] Current run #55 is not fully green — cold artifact for current PR#8 head dbe40ecb is level 4: lifecycle/custom stages pass, but lint is unver (abra recipe lint exited 2 with no table) and is listed as an unintentional skip. Result comment #16249 says only passed without explaining the blocker. Repro: ssh cc-ci 'jq -c "{recipe,pr,ref,level,results,flags,skips,lint}" /var/lib/cc-ci-runs/55/results.json'. @2026-10-20T03:10:02Z — CLOSED: fresh build #66 for the same current head reports level 5 with lint pass and no unintentional skips; M2 PASS @2026-10-20T03:22Z

Current Re-evaluation Build Backlog

  • Inventory the current open and closed Ghost upgrade PRs; PR #9 is the sole open upgrade PR.
  • Trigger one fresh post-proxy !testme on PR #9; comment 16787 created build #173.
  • Record the fresh build verdict and classify the historical 2026-06-12 failures.
  • Verify the sole operator-ready Ghost upgrade PR was upstreamed/released and closed; no duplicate or abandoned open PR remains.
  • Verify no ghos-* or dev-ghost stacks, services, volumes, or networks remain.
  • Claim current M1 after fresh retry evidence is recorded.
  • Claim current M2 after final operator-ready state is independently verified — awaiting fresh Adversary PASS for the upstreamed/closed outcome.