Through row 116
This commit is contained in:
@ -661,37 +661,22 @@ class CaseStudy(models.Model):
|
||||
|
||||
# 2.2.1.4
|
||||
power_technology_other = models.CharField(
|
||||
verbose_name=_("Other power technology"),
|
||||
help_text=_("Please specify the power technology."),
|
||||
verbose_name=_("Further information about power technology"),
|
||||
max_length=128,
|
||||
blank=True
|
||||
)
|
||||
|
||||
# 2.2.2
|
||||
energy_storage_capacity = models.DecimalField(
|
||||
verbose_name=_("Energy storage capacity"),
|
||||
help_text=_("Enter the total capacity of the energy storage system in kilowatt-hours (kWh)."),
|
||||
verbose_name=_("Total storage capacity (kWh)"),
|
||||
max_digits=20,
|
||||
decimal_places=3,
|
||||
blank=True,
|
||||
null=True,
|
||||
)
|
||||
|
||||
# 2.2.2.1
|
||||
maximum_power_output = models.DecimalField(
|
||||
verbose_name=_('Maximum power output'),
|
||||
help_text=_('Enter the maximum power output of the storage system in kilowatts (kW).'),
|
||||
max_digits=12,
|
||||
decimal_places=3,
|
||||
blank=True,
|
||||
null=True,
|
||||
)
|
||||
|
||||
# 2.2.2.2
|
||||
discharge_time = models.DecimalField(
|
||||
verbose_name=_('Time for discharge from full capacity'),
|
||||
help_text=_('Enter the time it takes to discharge from full capacity at maximum power output (in hours).'),
|
||||
max_digits=6,
|
||||
energy_transmission_capacity = models.DecimalField(
|
||||
verbose_name=_("Total transmission capacity (kW)"),
|
||||
max_digits=20,
|
||||
decimal_places=3,
|
||||
blank=True,
|
||||
null=True,
|
||||
@ -700,7 +685,7 @@ class CaseStudy(models.Model):
|
||||
# 2.2.3
|
||||
contractor_or_supplier_of_technology = models.CharField(
|
||||
verbose_name=_('Contractor and/or supplier of technology'),
|
||||
help_text=_('List companies that act as contractors or suppliers of technology related to energy storage.'),
|
||||
help_text=_('List companies that act as contractors or suppliers – e.g. Siemens Gamesa, GE, Alstom, Vestas, Hanwha Q CELLS, Mitsubishi, First Solar, Jinko Solar, Trina Solar, Suzlon Energy, Statkraft, Shanghai Electric, Ballard Power Systems, Panasonic, etc'),
|
||||
max_length=256,
|
||||
blank=True
|
||||
)
|
||||
@ -715,10 +700,12 @@ class CaseStudy(models.Model):
|
||||
)
|
||||
|
||||
# 2.2.5
|
||||
additional_technical_details = models.CharField(
|
||||
additional_technical_details = models.TextField(
|
||||
verbose_name=_("Additional technical or economic details"),
|
||||
help_text=_("Add any additional details such as: length, from-to, voltage, substations etc"),
|
||||
max_length=512,
|
||||
help_text=_("Add any additional details such as: length, from-to, voltage, \
|
||||
substations, power output, (dis)charge rates, how this technology or \
|
||||
project interacts with the energy system (e.g. provides reactive power \
|
||||
to ensure power supply in phase etc.)"),
|
||||
blank=True
|
||||
)
|
||||
|
||||
|
Reference in New Issue
Block a user