upstream(mattermost-lts): 2026-08-07 re-check (11.10.0 pre-release; ESR=11.7.8)
This commit is contained in:
@@ -17,6 +17,20 @@
|
||||
The `release-11.7` Docker Hub floating tag always points to the latest 11.7.x patch.
|
||||
IMPORTANT: Do NOT use 11.7.0–11.7.2 — they have a schemeid migration bug in the `roles` table
|
||||
when upgrading from 10.11.17+; use 11.7.3 or later (current: 11.7.7).
|
||||
- **2026-08-07 re-check** (endoflife.date/api/mattermost.json; GitHub releases API; Docker Hub):
|
||||
Operator (weekly /upgrade-all) directed extending PR #2 to **11.10.0** (newest on the 11.x
|
||||
innovation line, consistent with PR #2's existing line). **11.10.0 is a PRE-RELEASE** — GitHub
|
||||
`prerelease=True`, published 2026-08-04 (rc1 2026-07-17, rc2 2026-07-30, rc3+v11.10.0 2026-08-04);
|
||||
Docker Hub `mattermost/mattermost-team-edition:11.10.0` exists (462 MB, pushed 2026-08-04,
|
||||
actively pulled). No detailed release notes published yet (body = "Mattermost Platform Release
|
||||
11.10.0"). 11.10 cycle not yet on endoflife.date; monthly cadence → EOL ~2026-11-15. Innovation,
|
||||
NOT ESR. This run bumps 11.9.0 → 11.10.0 per operator instruction and flags the pre-release +
|
||||
ESR-vs-innovation choice prominently in the PR body + report. **ESR remains 11.7.8** (stable,
|
||||
EOL 2027-05-15) — the real LTS/ESR alternative if the operator wants LTS. **Survey-hint
|
||||
correction (again):** the 2026-08-07 survey claimed "alternative ESR = 10.12.4"; that is STILL
|
||||
wrong — 10.12 is an EXPIRED innovation release (EOL 2025-12-15, lts:false on endoflife.date);
|
||||
do NOT switch to 10.12.4. 10.11 ESR EOL 2026-08-15 (8 days); upstream main still pins 10.11.22.
|
||||
postgres 15-alpine HELD (major DB bump out of scope for weekly cron).
|
||||
- **2026-08-04 re-check** (endoflife.date/api/mattermost.json; GitHub releases; Docker Hub):
|
||||
**11.7.8** released 2026-07-31 is the newest 11.7.x ESR patch (ESR supported through
|
||||
2027-05-15). **11.9.0** (innovation, released 2026-07-08, cycle EOL **2026-10-15** ~10 weeks,
|
||||
|
||||
Reference in New Issue
Block a user