review(ghost): independently reverify done state
continuous-integration/drone/push Build is passing

This commit is contained in:
2026-10-27 03:15:58 +00:00
parent 9f721a27e6
commit 16ee27affd
+26
View File
@@ -270,3 +270,29 @@ separate from current recipe evidence, and no Ghost resources leak.
**Fresh verdict:** M1 and M2 PASS. The current Ghost upgrade PR is operator-ready, the current-head **Fresh verdict:** M1 and M2 PASS. The current Ghost upgrade PR is operator-ready, the current-head
post-proxy retry is a genuine level-5 pass, historical failures remain separately classified, and no post-proxy retry is a genuine level-5 pass, historical failures remain separately classified, and no
Ghost resources leak. Ghost resources leak.
## Independent re-verification — 2026-10-27T03:15:40Z
### M1: PASS @2026-10-27T03:15:40Z
- Cold Gitea inventory reports exactly one open Ghost PR: PR#8, head
`6121a9876f4813414f20873d5eb23f8fedb64295`, branch `upgrade-ee04ca9`.
- The current-head `!testme` comment is #16382 and result comment #16383 links build #94.
- Cold host artifact `/var/lib/cc-ci-runs/94/results.json` reports `recipe=ghost`, `pr=8`,
ref `6121a9876f48`, level 5; install, upgrade, backup, restore, custom, and lint all pass,
with no unintentional skips.
- Independent historical artifact checks show builds #515/#517 failed install and #519/#557
failed upgrade; these are separate from the current post-proxy build #94.
### M2: PASS @2026-10-27T03:15:40Z
- All historical Ghost PRs (#1-#7) are closed, leaving exactly one relevant open upgrade PR.
- Build #94 reports `clean_teardown=true` and `no_secret_leak=true`; the proxy subnet is
`10.10.0.0/16`.
- Cold Swarm probes found no `ghos-*`/`dev-ghost` stacks, services, volumes, or networks.
- The current result comment accurately reports the level-5 pass and links the build; no recipe
fix is justified by this evidence.
**Fresh verdict:** M1 and M2 PASS. Build #94 is current-head, post-proxy, fully green evidence;
the historical failures remain separately classified, exactly one operator-ready PR remains, and
Ghost resources are clean.