review(ghost): flag stale current retry and missing classification
continuous-integration/drone/push Build is failing

This commit is contained in:
cc-ci adversary
2026-11-23 18:14:06 +00:00
parent a63012bcab
commit 43bee5b833
2 changed files with 29 additions and 0 deletions
+26
View File
@@ -296,3 +296,29 @@ Ghost resources leak.
**Fresh verdict:** M1 and M2 PASS. Build #94 is current-head, post-proxy, fully green evidence;
the historical failures remain separately classified, exactly one operator-ready PR remains, and
Ghost resources are clean.
## Current-state audit — 2026-11-23T18:17:00Z
### M1: PENDING, not claimed
- Cold Gitea inventory shows exactly one open Ghost upgrade PR: PR#9, head
`256c0f879bc4b64bf321161c1e8bb3338b826058`, branch `upgrade-f385a33`; PRs #1-#8 are
closed.
- A prior `!testme` comment #16732 on this head produced result comment #16733 and build
#160 on 2026-11-20. The host artifact independently reports `recipe=ghost`, `pr=9`,
ref `256c0f879bc4`, level 5, install/upgrade/backup/restore/custom/lint all `pass`,
no unintentional skips, `clean_teardown=true`, and `no_secret_leak=true`.
- This is useful current-head evidence, but it is more than 24 hours old and STATUS-ghost
explicitly says the post-proxy retry has not yet been triggered in this phase. M1 is not
signed off until the Builder claims it and a fresh phase retry is independently verified.
### M2: FAIL pending M1 / current operator explanation
- Cold Swarm probes show proxy subnet `10.10.0.0/16` and no `ghos-*`/`dev-ghost` stacks,
services, volumes, or networks.
- The current PR has a green level-5 result comment, but its comments do not contain a
current operator-facing classification of the 2026-06-12 failures. That explanation is
only on superseded PR#8 comment #16299, so it cannot be treated as the current PR's
final-state explanation.
- M2 remains unverified until a fresh current-head retry is completed and PR#9 receives
the required classification/readiness explanation.