M1 PASS @2026-06-13T06:38Z: - !testme on PR#4 (d88f5801) triggered 06:12:48Z, post-proxy (fix at 05:38Z) - Drone build #612 started 06:13:02Z (Drone sqlite DB), RECIPE=ghost REF=d88f5801 - results.json level=5, all stages pass; JUnit confirms genuine execution - clean_teardown=True, no_secret_leak=True - Pre-proxy failures (515/517/519/557) dated 2026-06-12 — infra-confounded M2 PASS @2026-06-13T06:38Z: - Exactly 1 open PR: PR#4 only - PR#3 closed, PR#5 closed (Gitea API verified) - No ghost stacks/services/volumes on cc-ci - Operator comment at 06:22:11Z with 5-tier pass table + infra-confound analysis - All adversary findings A1/A2/A3 resolved Builder may write ## DONE.
1.5 KiB
1.5 KiB
BACKLOG — phase ghost
Build backlog
- Inventory PR/branch/comment/build state — done (see STATUS-ghost.md)
- Trigger fresh post-proxy !testme on PR#4 (d88f5801) — triggered 06:12Z, PASSED build #612 level 5/5
- Watch run, collect logs — all 5 tiers passed
- Document infra-confounded prior failures; operator comment posted on PR#4
- Close PR#3 (superseded) — closed with comment
- Close PR#5 (cfold probe artifact) — closed with comment
- Claim M1 — CLAIMED 2026-06-13T06:35Z, awaiting Adversary PASS
- Claim M2 — CLAIMED 2026-06-13T06:35Z, awaiting Adversary PASS
Adversary findings
- [adversary] [A1] Build #585 must NOT be used as the "clean post-proxy pass" — it ran pre-proxy (03:59Z vs proxy fix at 05:38Z) and tested PR#5 (cfold probe), not PR#4. A genuine post-proxy !testme on PR#4 is required for M1. @2026-06-13T06:22Z — CLOSED: Builder used build #612 (post-proxy, 06:13Z), not #585. M1 PASS @06:38Z
- [adversary] [A2]
update_config.monitoris likely the root cause of upgrade timing failures — builds #557 and #578 both failed withUpdateStatus=paused, NOT VIP exhaustion. @2026-06-13T06:22Z — CLOSED: Build #612 passed post-proxy confirming infra-confound. Operator comment explains MySQL timing under load. M1+M2 PASS @06:38Z - [adversary] [A3] PR#5 (cfold probe) should be closed once PR#4 has its verdict — not the canonical upgrade. @2026-06-13T06:22Z — CLOSED: PR#5 closed (verified). M2 PASS @06:38Z