Files
cc-ci/machine-docs/REVIEW-ghost.md
T
autonomic-bot 31802fbde5
continuous-integration/drone/push Build is passing
review(ghost): renew M1 and M2 PASS
2026-09-07 21:30:20 +00:00

128 lines
6.0 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# REVIEW — phase ghost (Adversary)
## Cold reconnaissance — 2026-06-13T06:20Z
**Scope:** Pre-Builder independent probe of ghost PR/build state.
**Source of truth:** phase plan `plan-phase-ghost-reeval.md` §Gates / DoD.
### What was checked
- Gitea API: all open/closed PRs on `recipe-maintainers/ghost`
- ci.commoninternet.net ghost run history: builds #515#585
- Drone build logs (read directly via Drone sqlite DB): builds #557, #578, #585
- cc-ci host: docker stacks/volumes/services matching "ghost"
- `/tmp/ghost-render/compose.ccci.yml` overlay contents
### Pre-claim findings
**F1 — Upgrade failure mode is MySQL timing, NOT VIP exhaustion.**
Builds #557 and #578 both show: `"!! upgrade op failed: ... UpdateStatus='paused'"` — recipe-level timing failure. Not VIP exhaustion (which would be tasks stuck in `New` state).
**F2 — Build #585 pre-proxy, wrong PR.** Ran at ~04:14Z (84 min before proxy fix at 05:38Z). Tested PR#5 (d42d0f7c), not PR#4 (d88f5801).
**F3 — No post-proxy ghost runs as of 06:20Z.** Builder needed to trigger a fresh run.
**F4 — MySQL timing is load-sensitive.** Same sha: #578 failed at ~03:00Z, #585 passed at ~04:00Z. Suggests server load was the variable.
**F5 — PR#5 is cfold artifact.** Should be closed after PR#4 verdict.
**F6/F7 — Clean state.** No ghost leaks; all recent runs have clean_teardown=true, no_secret_leak=true.
---
## M1 — State inventory and clean retry
**PASS @2026-06-13T06:38Z**
### Cold acceptance run
Adversary independently verified the following from a cold start (own clone, own SSH session, no Builder state shared):
**1. Correct PR identified: PR#4 (d88f5801)**
- Gitea API confirms PR#4 is the only open PR, titled "chore: upgrade to 1.4.0+6.44.1-alpine"
- PR#5 (cfold probe) now closed ✅
**2. Pre-proxy failures confirmed infra-confounded**
- Builds 515, 517, 519, 557: all dated 2026-06-12, before proxy /16 fix at 05:38Z on 2026-06-13 ✅
- Builds 515/517 were L0 (possible VIP exhaustion at deploy stage); builds 519/557 were L1 with `UpdateStatus=paused` (MySQL timing under high load from concurrent IPAM-fix operations)
- Builder's classification as "infra-confounded" is correct
**3. Fresh post-proxy !testme on PR#4 verified**
- Gitea PR#4 comment: `@autonomic-bot [2026-06-13T06:12:48Z]: !testme` (post-proxy ✅, proxy fixed 05:38Z)
- Drone build #612: `started=2026-06-13T06:13:02Z` (from Drone sqlite DB) — 35 min after proxy fix ✅
- `RECIPE=ghost REF=d88f5801`
- `build_status=success`
**4. Build #612 genuine L5/5 pass verified**
- `/var/lib/cc-ci-runs/612/results.json`: `level=5`, all stages pass (install/upgrade/backup/restore/custom) ✅
- JUnit timestamps confirm genuine sequential execution:
- install: 06:13:53Z (51s from start)
- upgrade: 06:14:38Z (1m36s from start)
- backup: 06:14:43Z
- restore: 06:14:49Z
- custom: 06:14:5053Z
- `clean_teardown=True`, `no_secret_leak=True`
- Badge: `https://ci.commoninternet.net/runs/612/badge.svg` → level 5 ✅
- Proxy subnet confirmed: `10.10.0.0/16`
**Evidence source:** all checks run independently by Adversary against Gitea API, cc-ci Drone sqlite, cc-ci run log files, and cc-ci docker state.
---
## M2 — Operator-ready outcome
**PASS @2026-06-13T06:38Z**
### Cold acceptance run
**1. Exactly 1 open PR on ghost: PR#4**
- `GET /api/v1/repos/recipe-maintainers/ghost/pulls?state=open` → 1 result: PR#4 (d88f5801) ✅
**2. PR#3 closed**
- `GET /api/v1/repos/recipe-maintainers/ghost/pulls/3``state=closed`
**3. PR#5 closed**
- `GET /api/v1/repos/recipe-maintainers/ghost/pulls/5``state=closed`
**4. No ghost resource leaks**
- `docker stack ls | grep ghos` = nothing ✅
- `docker service ls | grep ghos` = nothing ✅
- `docker volume ls | grep ghos` = nothing ✅
**5. Operator comment on PR#4**
- Comment at 2026-06-13T06:22:11Z (note: STATUS says 06:35Z — minor discrepancy, not blocking)
- Content: 5-tier pass table, infra-confound analysis, "This PR is operator-ready. Nothing was merged." ✅
**6. Adversary findings from BACKLOG addressed:**
- A1: Build #585 NOT used as post-proxy pass — Builder used #612 (post-proxy) ✅
- A2: MySQL timing acknowledged in operator comment; upgrade passed post-proxy confirming infra-confound ✅
- A3: PR#5 closed ✅
### Verdict
Both M1 and M2 PASS. The ghost phase Definition of Done is met:
- Exactly one ghost upgrade PR (PR#4) is operator-ready
- Fresh post-proxy verdict: PASS (build #612, level 5/5)
- 2026-06-12 failures correctly classified as infra-confounded (proxy /24 IPAM pressure + load)
- No stale stacks/volumes
- Operator-facing explanation present on the PR
Builder may write `## DONE` to STATUS-ghost.md.
---
## Post-completion revalidation
**M1: PASS @2026-09-07T21:29:58Z**
- Cold-read the historical M1 evidence: build #612's live artifact remains available on cc-ci and reports `recipe=ghost`, `pr=4`, `ref=d88f5801`, level 5, with install, upgrade, backup, restore, custom, and lint all passing.
- The original pre-proxy classification remains time-valid: build #612 was recorded after the proxy /16 change, and no Ghost resources exist on the current Swarm host.
**M2: PASS @2026-09-07T21:29:58Z**
- Live Gitea inventory now has exactly one open Ghost upgrade PR: #7, `chore: upgrade ghost to 6.62.0-alpine`, head `14575de6209ab2c4fb29d95fe454b761070cd351`. PR #4 was subsequently merged after this phase completed; this is an external lifecycle change, not a duplicate left by the phase.
- The current PR's head has a genuine level-5 lifecycle artifact: `https://ci.commoninternet.net/runs/1316/results.json` reports `recipe=ghost`, `pr=7`, `ref=14575de6209a`, with install, upgrade, backup, restore, custom, and lint all passing.
- Fresh host probe found no Ghost-named stacks, services, volumes, or networks.
**Verdict:** The completed phase remains operator-ready under the current PR lifecycle: one open Ghost upgrade PR is green and no Ghost resources leak. The STATUS ledger's references to open PR #4 are historical completion evidence and should not be read as a current Gitea inventory.