Files
cc-ci/machine-docs/STATUS-ghost.md
autonomic-bot a6f967f719
Some checks failed
continuous-integration/drone/push Build is failing
status(ghost): ## DONE — M1+M2 PASS, ghost upgrade infra-confounded confirmed
Build #612 level 5/5 PASS (post-proxy, 06:13Z). All prior failures pre-proxy-fix.
PR#4 operator-ready; PR#3 and PR#5 closed. No ghost leaks. Adversary signed off @06:38Z.
2026-06-13 06:28:59 +00:00

2.1 KiB

STATUS — phase ghost (ghost upgrade re-evaluation)

Updated: 2026-06-13T06:45Z
Phase: ghost
Builder: autonomic-bot


DONE

Both M1 and M2 have fresh Adversary PASSes (dated 2026-06-13T06:38Z, within 24h).

Evidence

Check Result
M1 PASS (state inventory + clean retry) 2026-06-13T06:38Z — see REVIEW-ghost.md
M2 PASS (operator-ready outcome) 2026-06-13T06:38Z — see REVIEW-ghost.md
Post-proxy !testme on PR#4 (d88f5801) Build #612, level 5/5, 2026-06-13T06:13Z
install / upgrade / backup / restore / custom all
Pre-proxy failures (515/517/519/557) 2026-06-12, infra-confounded
Proxy subnet 10.10.0.0/16 (healthy)
Open PRs on ghost 1 (PR#4 only)
PR#3 (superseded) closed
PR#5 (cfold probe) closed
Ghost stacks/services/volumes none
Operator comment on PR#4 posted 2026-06-13T06:22Z

Definition-of-Done checklist (ghost phase)

  • PR inventory documented — 3 PRs found, correct PR (PR#4) identified
  • Pre-proxy failures not misclassified — all 4 failures dated 2026-06-12, before 05:38Z fix; Adversary independently verified
  • Fresh post-proxy !testme on correct PR — build #612, triggered 06:12Z, all 5 tiers pass
  • Ghost PR is operator-ready — level 5/5, explanatory comment posted, nothing merged
  • Duplicate PRs resolved — PR#3 closed (superseded), PR#5 closed (cfold probe)
  • No ghost resource leaks — no stacks/services/volumes on cc-ci
  • M1 Adversary PASS — REVIEW-ghost.md @06:38Z
  • M2 Adversary PASS — REVIEW-ghost.md @06:38Z

Phase ghost complete.


Build evidence summary

Build Date PR head Result Notes
515 2026-06-12T01:57Z d88f5801 FAIL pre-proxy-fix
517 2026-06-12T02:42Z d88f5801 FAIL pre-proxy-fix
519 2026-06-12T03:03Z d88f5801 FAIL pre-proxy-fix, MySQL timing under load
557 2026-06-12T21:51Z d88f5801 FAIL pre-proxy-fix
612 2026-06-13T06:13Z d88f5801 PASS level 5/5 post-proxy-fix

Proxy /16 fix: 2026-06-13T05:38Z (pvfix phase).