3.6 KiB
STATUS — phase ghost (ghost upgrade re-evaluation)
Updated: 2026-10-13T03:14:20Z
Phase: ghost
Builder: autonomic-bot
DONE
Both M1 and M2 have fresh Adversary PASSes dated 2026-10-13T03:14:20Z. The current canonical Ghost upgrade PR is #8; historical PR#7 is closed.
| Check | Result |
|---|---|
| Current Ghost PR | PR#8, upgrade-ee04ca9, head ee04ca9eb4f1b00ab6719e6858f7876088e0ee3d |
| Fresh post-proxy retry | Gitea comment 16237; Drone build #50 |
| Build #50 | success, level 5/5; install, upgrade, backup, restore, custom, and lint passed |
| PR result comment | Gitea comment 16238 reports passed and links build #50 |
| Post-run cleanup | no ghos-*/dev-ghost stacks, services, or volumes |
| M1 Adversary PASS | REVIEW-ghost.md, 2026-10-13T03:14:20Z |
| M2 Adversary PASS | REVIEW-ghost.md, 2026-10-13T03:14:20Z |
Definition-of-Done checklist (ghost phase)
- Exactly one current Ghost upgrade PR is operator-ready
- Fresh post-proxy
!testmeresult is green for the current PR head - 2026-06-12 failures are classified separately from current recipe evidence
- Historical duplicate PRs are closed; no current duplicate exists
- No Ghost resources remain after the fresh retry
- M1 and M2 have fresh Adversary PASSes
M1 — State inventory and clean retry
Result: current canonical Ghost upgrade PR verified by build #50.
Live inventory
| Check | Result |
|---|---|
| Open Ghost PRs | PR#8 only: upgrade-ee04ca9 at ee04ca9eb4f1b00ab6719e6858f7876088e0ee3d |
| Historical PR#7 | closed; not the current upgrade PR |
| Historical duplicates | PR#1 through PR#7 closed |
| Proxy subnet | 10.10.0.0/16 |
| Ghost stacks/services/volumes before retry | none |
| Fresh retry | Gitea comment 16237 at 2026-10-13T03:11:52Z; Drone build #50 success, level 5/5 |
Adversary verification inputs
WHAT: M1 and M2 claim the current live PR recipe-maintainers/ghost#8 and fresh post-proxy build #50.
HOW:
set -a; . /srv/cc-ci/cc-ci-plan/load-env.sh; set +a
curl -fsS -u "$GITEA_USERNAME:$GITEA_PASSWORD" \
"https://$GITEA_URL/api/v1/repos/recipe-maintainers/ghost/pulls?state=open" \
| jq -r '.[] | [.number, .state, .head.sha, .head.ref] | @tsv'
ssh cc-ci 'docker network inspect proxy --format "{{range .IPAM.Config}}{{.Subnet}}{{end}}"; docker stack ls --format "{{.Name}}" | rg "^(ghos-|dev-ghost)" || true; jq -c "{recipe,pr,ref,level,results,flags,skips}" /var/lib/cc-ci-runs/50/results.json'
EXPECTED: one open PR (8, ee04ca9eb4f1b00ab6719e6858f7876088e0ee3d, upgrade-ee04ca9), proxy subnet 10.10.0.0/16, and no Ghost stack output. Build #50 reports success, level 5, all lifecycle results pass, clean_teardown=true, and no_secret_leak=true.
WHERE: Gitea issue comments 16237 and 16238; Drone URL https://drone.ci.autonomic.zone/recipe-maintainers/cc-ci/50; host artifact /var/lib/cc-ci-runs/50/results.json; Adversary evidence in REVIEW-ghost.md.
Build evidence summary
| Build | Date | PR head | Result | Notes |
|---|---|---|---|---|
| 515 | 2026-06-12T01:57Z | d88f5801 | ❌ FAIL | pre-proxy-fix |
| 517 | 2026-06-12T02:42Z | d88f5801 | ❌ FAIL | pre-proxy-fix |
| 519 | 2026-06-12T03:03Z | d88f5801 | ❌ FAIL | pre-proxy-fix, MySQL timing under load |
| 557 | 2026-06-12T21:51Z | d88f5801 | ❌ FAIL | pre-proxy-fix |
| 612 | 2026-06-13T06:13Z | d88f5801 | ✅ PASS level 5/5 | post-proxy-fix |
| 50 | 2026-10-13T03:12Z | ee04ca9e | ✅ PASS level 5/5 | fresh current PR#8 retry |
Proxy /16 fix: 2026-06-13T05:38Z (pvfix phase).