Files
cc-ci/machine-docs/STATUS-ghost.md
T
autonomic-bot 6d592b9417
continuous-integration/drone/push Build is passing
status(ghost): record fresh PR8 pass
2026-10-13 03:16:42 +00:00

3.6 KiB

STATUS — phase ghost (ghost upgrade re-evaluation)

Updated: 2026-10-13T03:14:20Z Phase: ghost
Builder: autonomic-bot


DONE

Both M1 and M2 have fresh Adversary PASSes dated 2026-10-13T03:14:20Z. The current canonical Ghost upgrade PR is #8; historical PR#7 is closed.

Check Result
Current Ghost PR PR#8, upgrade-ee04ca9, head ee04ca9eb4f1b00ab6719e6858f7876088e0ee3d
Fresh post-proxy retry Gitea comment 16237; Drone build #50
Build #50 success, level 5/5; install, upgrade, backup, restore, custom, and lint passed
PR result comment Gitea comment 16238 reports passed and links build #50
Post-run cleanup no ghos-*/dev-ghost stacks, services, or volumes
M1 Adversary PASS REVIEW-ghost.md, 2026-10-13T03:14:20Z
M2 Adversary PASS REVIEW-ghost.md, 2026-10-13T03:14:20Z

Definition-of-Done checklist (ghost phase)

  • Exactly one current Ghost upgrade PR is operator-ready
  • Fresh post-proxy !testme result is green for the current PR head
  • 2026-06-12 failures are classified separately from current recipe evidence
  • Historical duplicate PRs are closed; no current duplicate exists
  • No Ghost resources remain after the fresh retry
  • M1 and M2 have fresh Adversary PASSes

M1 — State inventory and clean retry

Result: current canonical Ghost upgrade PR verified by build #50.

Live inventory

Check Result
Open Ghost PRs PR#8 only: upgrade-ee04ca9 at ee04ca9eb4f1b00ab6719e6858f7876088e0ee3d
Historical PR#7 closed; not the current upgrade PR
Historical duplicates PR#1 through PR#7 closed
Proxy subnet 10.10.0.0/16
Ghost stacks/services/volumes before retry none
Fresh retry Gitea comment 16237 at 2026-10-13T03:11:52Z; Drone build #50 success, level 5/5

Adversary verification inputs

WHAT: M1 and M2 claim the current live PR recipe-maintainers/ghost#8 and fresh post-proxy build #50.

HOW:

set -a; . /srv/cc-ci/cc-ci-plan/load-env.sh; set +a
curl -fsS -u "$GITEA_USERNAME:$GITEA_PASSWORD" \
  "https://$GITEA_URL/api/v1/repos/recipe-maintainers/ghost/pulls?state=open" \
  | jq -r '.[] | [.number, .state, .head.sha, .head.ref] | @tsv'
ssh cc-ci 'docker network inspect proxy --format "{{range .IPAM.Config}}{{.Subnet}}{{end}}"; docker stack ls --format "{{.Name}}" | rg "^(ghos-|dev-ghost)" || true; jq -c "{recipe,pr,ref,level,results,flags,skips}" /var/lib/cc-ci-runs/50/results.json'

EXPECTED: one open PR (8, ee04ca9eb4f1b00ab6719e6858f7876088e0ee3d, upgrade-ee04ca9), proxy subnet 10.10.0.0/16, and no Ghost stack output. Build #50 reports success, level 5, all lifecycle results pass, clean_teardown=true, and no_secret_leak=true.

WHERE: Gitea issue comments 16237 and 16238; Drone URL https://drone.ci.autonomic.zone/recipe-maintainers/cc-ci/50; host artifact /var/lib/cc-ci-runs/50/results.json; Adversary evidence in REVIEW-ghost.md.


Build evidence summary

Build Date PR head Result Notes
515 2026-06-12T01:57Z d88f5801 ❌ FAIL pre-proxy-fix
517 2026-06-12T02:42Z d88f5801 ❌ FAIL pre-proxy-fix
519 2026-06-12T03:03Z d88f5801 ❌ FAIL pre-proxy-fix, MySQL timing under load
557 2026-06-12T21:51Z d88f5801 ❌ FAIL pre-proxy-fix
612 2026-06-13T06:13Z d88f5801 ✅ PASS level 5/5 post-proxy-fix
50 2026-10-13T03:12Z ee04ca9e ✅ PASS level 5/5 fresh current PR#8 retry

Proxy /16 fix: 2026-06-13T05:38Z (pvfix phase).