continuous-integration/drone/push Build is failing
A5-2: bridge.py now posts Gitea commit statuses on the recipe PR's head SHA: - pending on build trigger (so testme-on-pr.sh sees the run immediately) - success/failure on build finish (so testme-on-pr.sh returns VERDICT=GREEN/RED) Added post_commit_status() using the existing _api() helper + GITEA_TOKEN. Called from process_testme() (pending) and watch_and_reflect() (terminal state). A5-1: added recipe-maintainers/custom-html-tiny to bridge POLL_REPOS in bridge.nix so !testme on custom-html-tiny PRs is picked up by the bridge poller.
1.1 KiB
1.1 KiB
STATUS — cc-ci Phase 5 Builder
Phase: 5 — Verify /recipe-upgrade + testme-on-pr.sh end-to-end flow
SSOT: /srv/cc-ci/cc-ci-plan/plan-phase5-verify-upgrade-flow.md
Started: 2026-05-31
Current focus
Running V3 — /recipe-upgrade custom-html-tiny end-to-end (V1/V2/V7 evidence collected alongside).
Verification item status
| Item | Status | Evidence |
|---|---|---|
| V1 — !testme trigger + result-back | IN PROGRESS | D1 PASS from Phase 3 (REVIEW.md); fresh run pending via V3 |
| V2 — testme-on-pr.sh reads verdict | IN PROGRESS | Running via V3 flow |
| V3 — /recipe-upgrade sandbox GREEN | IN PROGRESS | custom-html-tiny upgrade underway |
| V4 — 3-iter regression loop | TODO | |
| V5 — stale-test DEFAULT = comment | TODO | |
| V6 — --with-tests opens+verifies cc-ci test PR | TODO | |
| V7 — mirror reconciliation | IN PROGRESS | open-recipe-pr.sh reconciler running |
| V8 — /upgrade-all DEFAULT run | TODO | |
| V8a — cc-ci-upgrader agent | TODO | |
| V9 — cleanup | TODO |
Phase 5 gates
(None claimed yet — working V3.)
Blocked
(none)