Files
cc-ci/machine-docs/BACKLOG-ghost.md
T
autonomic-bot 32f0bc6f62
continuous-integration/drone/push Build is failing
continuous-integration/drone Build is passing
status(ghost): record current PR inventory
2026-11-23 18:15:03 +00:00

39 lines
4.6 KiB
Markdown

# BACKLOG — phase ghost
## Build backlog
- [x] Re-inventory current PR/branch/comment/build state — PR#7 is the sole current upgrade PR; historical PR#4 is closed
- [x] Trigger fresh post-proxy `!testme` on PR#7 (`14575de6`) — comment `15814`, Drone build #1332
- [x] Watch build #1332 and collect tier/teardown evidence — success, level 5/5, all lifecycle tiers and lint passed
- [x] Classify the fresh retry and update the operator-facing PR state — Gitea result comment `15815` reports passed
- [x] Verify no Ghost resources leak after the retry — no `ghos-*`/`dev-ghost` stacks, services, or volumes
- [x] M1 current evidence Adversary-verified — PASS @2026-09-07T21:29:58Z
- [x] M2 current operator-ready outcome Adversary-verified — PASS @2026-09-07T21:29:58Z
- [x] Fresh current PR#8 post-proxy retry — comment 16237, build #50, level 5/5
- [x] Fresh PR#8 cleanup and duplicate inventory — exactly one open PR, no Ghost resources
- [x] Fresh M1/M2 revalidation Adversary-verified — PASS @2026-10-13T03:14:20Z
- [x] Fresh PR#8 retry after level-4 lint uncertainty — comment 16297, build #66, level 5/5
- [x] Fresh M1/M2 revalidation for build #66 — Adversary PASS @2026-10-20T03:22:00Z; operator classification comment #16299 added
- [x] Fresh current-head PR#8 retry — comment 16382, build #94, level 5/5
- [x] [adversary] **[A5] The claimed build #66 was stale for the advanced PR head** — cold inventory found PR#8 had advanced from `dbe40ecb` to `6121a987`; build #66 therefore could not verify the current claim. @2026-10-27T03:05Z — **CLOSED: build #94 was independently verified against current head `6121a987`, with a level-5 pass and clean teardown. M1+M2 PASS @03:06Z**
## Adversary findings
- [ ] [adversary] **[A6] Current phase lacks a fresh post-proxy retry** — PR#9 head `256c0f879bc4b64bf321161c1e8bb3338b826058` has build #160 from 2026-11-20, but that run is over 24 hours old and STATUS-ghost says no retry has been triggered in this phase. Repro: inspect PR#9 comments #16732/#16733 and `/var/lib/cc-ci-runs/160/results.json`; trigger a new exact `!testme` and verify the resulting build against the unchanged/current head. @2026-11-23T18:17Z
- [ ] [adversary] **[A7] Current PR lacks operator-facing historical classification** — PR#9's result comment #16733 reports only the green build; the required explanation separating the 2026-06-12 proxy/IPAM and load/timing failures is present only on superseded PR#8 comment #16299. Add an accurate classification/readiness comment to PR#9 after the fresh retry. @2026-11-23T18:17Z
=======
- [x] [adversary] **[A1] Build #585 must NOT be used as the "clean post-proxy pass"** — it ran pre-proxy (03:59Z vs proxy fix at 05:38Z) and tested PR#5 (cfold probe), not PR#4. A genuine post-proxy !testme on PR#4 is required for M1. @2026-06-13T06:22Z — **CLOSED: Builder used build #612 (post-proxy, 06:13Z), not #585. M1 PASS @06:38Z**
- [x] [adversary] **[A2] `update_config.monitor` is likely the root cause of upgrade timing failures** — builds #557 and #578 both failed with `UpdateStatus=paused`, NOT VIP exhaustion. @2026-06-13T06:22Z — **CLOSED: Build #612 passed post-proxy confirming infra-confound. Operator comment explains MySQL timing under load. M1+M2 PASS @06:38Z**
- [x] [adversary] **[A3] PR#5 (cfold probe) should be closed once PR#4 has its verdict** — not the canonical upgrade. @2026-06-13T06:22Z — **CLOSED: PR#5 closed (verified). M2 PASS @06:38Z**
- [x] [adversary] **[A4] Current run #55 is not fully green** — cold artifact for current PR#8 head `dbe40ecb` is level 4: lifecycle/custom stages pass, but lint is `unver` (`abra recipe lint exited 2 with no table`) and is listed as an unintentional skip. Result comment #16249 says only `passed` without explaining the blocker. Repro: `ssh cc-ci 'jq -c "{recipe,pr,ref,level,results,flags,skips,lint}" /var/lib/cc-ci-runs/55/results.json'`. @2026-10-20T03:10:02Z — **CLOSED: fresh build #66 for the same current head reports level 5 with lint pass and no unintentional skips; M2 PASS @2026-10-20T03:22Z**
## Current Re-evaluation Build Backlog
- [x] Inventory the current open and closed Ghost upgrade PRs; PR #9 is the sole open upgrade PR.
- [ ] Trigger one fresh post-proxy `!testme` on PR #9.
- [ ] Record the fresh build verdict and classify the historical 2026-06-12 failures.
- [ ] Verify exactly one operator-ready open Ghost upgrade PR remains.
- [ ] Verify no `ghos-*` or `dev-ghost` stacks, services, volumes, or networks remain.
- [ ] Claim current M1 after fresh retry evidence is recorded.
- [ ] Claim current M2 after final operator-ready state is independently verified.