1.2 KiB
1.2 KiB
BACKLOG — phase bsky
Build backlog
- B1: Root-cause diagnosis — inspect recipe compose/entrypoint + actual
:0.4image vs exact tags on cc-ci (2026-06-11) - B2: Upstream research persisted to cc-ci-plan/upstream/bluesky-pds.md (plan repo f395247)
- B3: DECISIONS.md entry — pin choice (exact 0.4.219 over 0.5.1-main / digest pin), version label bump
- B4: Mirror PR branch
upgrade-0.3.0+v0.4.219— compose.yml re-pin + label bump; open PR on recipe-maintainers/bluesky-pds - B5:
!testmeon the PR → full lifecycle green (install/health, upgrade-path status justified, backup/restore, functional, L5 lint); record level under de-capped semantics + reconcile expected baseline - B6: Screenshot on the green PR run — verify PNG real/representative/credential-free (Read it); SCREENSHOT hook only if needed
- B7: Claim M1 (root cause + green fix PR + screenshot verified)
- B8: Close DEFERRED bluesky entries with pointers; JOURNAL note updating shot-phase N/A disposition
- B9: Operator handoff summary in STATUS-bsky.md (what was wrong, what the PR changes, post-merge expectations incl. canonical/warm reseed)
- B10: Claim M2
Adversary findings
(Adversary-owned)