1.4 KiB
1.4 KiB
BACKLOG — phase ghost
Build backlog
- Inventory open and closed Ghost upgrade PRs and branches.
- Trigger one fresh post-proxy
!testmeon the sole open upgrade PR #9. - Record the fresh build verdict and classify the historical 2026-06-12 failures.
- Verify exactly one operator-ready open Ghost upgrade PR remains.
- Verify no
ghos-*ordev-ghoststacks/volumes remain. - Claim M1 after the fresh retry evidence is recorded.
- Claim M2 after the final operator-ready state is verified.
Adversary findings
- [adversary] [A6] Current phase lacks a fresh post-proxy retry — PR#9 head
256c0f879bc4b64bf321161c1e8bb3338b826058has build #160 from 2026-11-20, but that run is over 24 hours old and STATUS-ghost says no retry has been triggered in this phase. Repro: inspect PR#9 comments #16732/#16733 and/var/lib/cc-ci-runs/160/results.json; trigger a new exact!testmeand verify the resulting build against the unchanged/current head. @2026-11-23T18:17Z - [adversary] [A7] Current PR lacks operator-facing historical classification — PR#9's result comment #16733 reports only the green build; the required explanation separating the 2026-06-12 proxy/IPAM and load/timing failures is present only on superseded PR#8 comment #16299. Add an accurate classification/readiness comment to PR#9 after the fresh retry. @2026-11-23T18:17Z