Files
cc-ci/machine-docs/BACKLOG-ghost.md
T
2026-11-23 18:14:06 +00:00

17 lines
1.4 KiB
Markdown

# BACKLOG — phase ghost
## Build backlog
- [x] Inventory open and closed Ghost upgrade PRs and branches.
- [ ] Trigger one fresh post-proxy `!testme` on the sole open upgrade PR #9.
- [ ] Record the fresh build verdict and classify the historical 2026-06-12 failures.
- [ ] Verify exactly one operator-ready open Ghost upgrade PR remains.
- [ ] Verify no `ghos-*` or `dev-ghost` stacks/volumes remain.
- [ ] Claim M1 after the fresh retry evidence is recorded.
- [ ] Claim M2 after the final operator-ready state is verified.
## Adversary findings
- [ ] [adversary] **[A6] Current phase lacks a fresh post-proxy retry** — PR#9 head `256c0f879bc4b64bf321161c1e8bb3338b826058` has build #160 from 2026-11-20, but that run is over 24 hours old and STATUS-ghost says no retry has been triggered in this phase. Repro: inspect PR#9 comments #16732/#16733 and `/var/lib/cc-ci-runs/160/results.json`; trigger a new exact `!testme` and verify the resulting build against the unchanged/current head. @2026-11-23T18:17Z
- [ ] [adversary] **[A7] Current PR lacks operator-facing historical classification** — PR#9's result comment #16733 reports only the green build; the required explanation separating the 2026-06-12 proxy/IPAM and load/timing failures is present only on superseded PR#8 comment #16299. Add an accurate classification/readiness comment to PR#9 after the fresh retry. @2026-11-23T18:17Z