Files
cc-ci/machine-docs/BACKLOG-ghost.md
T
2026-11-23 18:14:06 +00:00

1.4 KiB

BACKLOG — phase ghost

Build backlog

  • Inventory open and closed Ghost upgrade PRs and branches.
  • Trigger one fresh post-proxy !testme on the sole open upgrade PR #9.
  • Record the fresh build verdict and classify the historical 2026-06-12 failures.
  • Verify exactly one operator-ready open Ghost upgrade PR remains.
  • Verify no ghos-* or dev-ghost stacks/volumes remain.
  • Claim M1 after the fresh retry evidence is recorded.
  • Claim M2 after the final operator-ready state is verified.

Adversary findings

  • [adversary] [A6] Current phase lacks a fresh post-proxy retry — PR#9 head 256c0f879bc4b64bf321161c1e8bb3338b826058 has build #160 from 2026-11-20, but that run is over 24 hours old and STATUS-ghost says no retry has been triggered in this phase. Repro: inspect PR#9 comments #16732/#16733 and /var/lib/cc-ci-runs/160/results.json; trigger a new exact !testme and verify the resulting build against the unchanged/current head. @2026-11-23T18:17Z
  • [adversary] [A7] Current PR lacks operator-facing historical classification — PR#9's result comment #16733 reports only the green build; the required explanation separating the 2026-06-12 proxy/IPAM and load/timing failures is present only on superseded PR#8 comment #16299. Add an accurate classification/readiness comment to PR#9 after the fresh retry. @2026-11-23T18:17Z